Laserfiche WebLink
f <br /> RES'NA 'r.✓ <br /> S) SAFETY PLAN <br /> i <br /> FACHITy BACKGROUND <br /> Unleaded product <br /> line from tank no. 2 leaked product. The <br /> the tanks were recertified. Elevated levels product line was <br /> Of four soil samples collected adjacent to the gasoline hydrocarbons were recorrepaired <br /> ed and <br /> Product line. two <br /> WORK PLAN <br /> Task One; <br /> Excavation of a <br /> hydrocarbon • PProadmately 10-15 yards of <br /> the detected Impacted SOd from in the area of <br /> product line leak. <br /> Tek 1w0: Conf. <br /> umation Sampling. Five cont <br /> �Ples will be collected wmation soil <br /> removal, to verify source <br /> Task Tbnee: Backfdiin <br /> g' subsequent to the collection of the <br /> conf"�ation soil Samples the excavated area will <br /> the Cit the by <br /> y of Stockton Public W set fourth <br /> Works Department. <br /> f <br /> s <br /> I <br /> f <br /> r <br /> PACE 2 � <br />