Laserfiche WebLink
RESNA <br /> SITE SAFETY PLAN <br /> Physical Hazards <br /> Taskfs) Hazard ::>::::::>::: <br /> MrtiQaton.Measure ... <br /> 1 -3 Heavy Equipment (PHoise &Physical AN heavy equipment used on this project will be <br /> contact) in good working order and operated in <br /> accordance with recognized industry standards <br /> and Cal-OSHA Title 8.Subchapter 4, <br /> Construction Safety Orders. In addition, an <br /> exclusion zone appries to all personnel. The <br /> exclusion zone will be 20 feet to the front and <br /> either side of the operating drill rig. Personnel <br /> will not be allowed under booms or augers at <br /> any time. <br /> AN equipment operators and ground crews <br /> working in dose proximity of heavy equipment <br /> will be supplied with ear protection. <br /> 1 -3 Dust The dust hazard will be mitigated by not <br /> mowing ground crew to be located down wind <br /> of drilling and excavation activity. In addition, <br /> water will be applied to control the dust if <br /> visible levels of dust are generated_ <br /> Fire and Explosion Hazards <br /> List Flammable or Combustible materials on-site. Keep sources of ignition away from these materials. <br /> Warrrritat>ie IFr Font <br /> 1a3w°FJ .:. ,.::. .: Combustiibis.tFlash <br /> Gasoline Diesel <br /> Type and Location of Fire Extinguishers (Show on map for large projects) <br /> Dry chemical fire extinguishers - class A S & C. Fire extinguishers are present in all RESNA vehicles. <br /> PAGE 4 <br />