Laserfiche WebLink
+sJ . <br /> 1992 First Quarterly Report' <br /> + - Stockton Police Facility,.22 E..Market St.,.Stockton <br /> May 6, 1992 <br /> Page 2 <br /> The monitoring wellistitgroundwater elevation was measured to be 44.81.feet below grade. <br /> Regional groundwater flows northeast toward a pumping depression east of Stockton, based upon <br /> San Joaquin Flood.Control and Water-Conservation District; Spring 1991 data. <br /> To prevent any remaining hydrocarbon.impacted soils associated with the former line leak from <br /> acting-as a potential source of groundwater degradation, the City,plans,to re-excavate impacted <br /> soils. An excavation workplan outlining field methods.,is_ beingprepared by RESNA. A <br /> . :submittal date of May 15 1992 is anticipated <br /> If you have any questions or comments.please contact John P. Lane, at your convenience, at our <br /> Escalon office (209/838-3507). <br /> Respectfully, <br /> RESNA Industries, Inc. <br /> e . <br /> J n P. Lane <br /> Project Geologist <br /> Gregory P. Stahl <br /> .CA Registered Geologist No.-5023 <br /> TJL/ggk <br /> Attachments <br /> SPLR5192.TJL <br />