My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 11:59:42 AM
Creation date
3/12/2020 3:54:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1X0t D #0 <br /> ,4UST <br /> CV5, <br /> *OIX Aka WR ORy[IOGKL• <br /> TP-201 . 101) <br /> Leak Rate of Drop Tube/Drain Valve Assembly and Leak Rate of Drop Tube Overfill Protection Devices and Spill <br /> Container Drain Valves Report Form <br /> Permit Number: Test Company : Confidence UST Services, Inc. <br /> Confirmation : Technician : Alan Johnson <br /> Site Name : Stockton Gas Certification Number Expiration Date <br /> Site Address : 1687 Highway 99 District: SJV-0267 9/30/2019 <br /> City/Zip: Stockton 95202 Franklin (Healy) : 1001973708 04/08/2021 <br /> Date/Time of Test : 5/10/2019 at Veeder-Root: B45536 06/21 /2019 <br /> DROP TUBE DRAIN VALVE AND OVERFILL PROTECTION DEVICE PRESSURE INTEGRITY TEST <br /> ❑ Straight Drop Tube ' 0 Drop Tube with an Overfill Protection Device' <br /> Pressure measuring device 0 digital manometer ❑ mechanical gauge <br /> Calibration date for pressure measuring device must be within 180 days of the test) 03/20/2019 <br /> Ending value dor digital manometer drift test if applicable (must be 0. 01 in. w. c. or less) 0 . 00" <br /> Drop Tube Drain Valve Pressure Test: Drop Tube Overfill Device Pressure Test " Corrected " Overfill Device Leak Rate <br /> Flow rate 80 ml/min Flow rate 200 mUmin <br /> Minus Equals <br /> Time to reach 2 in. Drain valve Final Time to reach 2 in. Overfill Final Overfill Device Drain Valve Corrected <br /> w. c. at 80 ml/min. leak rate' Pressure w. c. at 200 ml/min. leak rate' pressure Leak Rate Leak Rate Leak Rate <br /> Tank Grade sec, ml/min in, w. c , mins , ml/min. in. w. c. ml/min. ml/min. ml/min. <br /> 1 Regular 2 min 4 see 11 ml 2. 04" <br /> 2 Super 2 min 23 see 10 ml 2009" <br /> 3 <br /> 4 <br /> NOTES : 'A straight drop tube must be tested with a bladder in place and using a flow rate of 80 ml/min. <br /> ZThe bladder section of TP-201 . 11) may be skipped if the entire drop tube passes with a leak rate below 80 ml/min. z <br /> 'Leak Rate = nitrogen flow rate needed to maintain a constant pressure (at least 2 in. w.c.) for 30 seconds. <br /> 00 <br /> I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed after reasonable inquiry , the Cil Z <br /> statements and information provided in this document are true, accurate, and complete. > <br /> —q 2: <br /> Signature of Technician : Date : 5/10/2019 = a <br /> M o ° <br />
The URL can be used to link to this page
Your browser does not support the video tag.