Laserfiche WebLink
Letter to Mr. Sasson <br /> July 23, 1997 <br /> Page 2 of 2 <br /> Following collection of the soil and groundwater samples,the boreholes will be grouted <br /> using Portland type I-II containing less than 5 percent prehydrated bentonite powder to just <br /> below the surface, and finished to the surface with asphalt cold patch. <br /> Please find enclosed in Attachment III the City of Ripon Encroachment permit and a San <br /> Joaquin County Public Health Services Non-Refundable Permit applicaton for the additional <br /> work. Be advised that Versar would like to conduct the field activities during the week of July <br /> 28, 1997. A grout inspection will be required by your office for this investigation. You will be <br /> notified at least 24 hours prior to commencement of work. If you have any questions about the <br /> proposed scope of work please call me at(916) 863-9323. <br /> Sincerely <br /> � . -" <br /> Tim Berger, R.G. 5225 <br /> Senior Geologist <br /> Environmental Management Division <br /> Attachments <br /> H1PROJECTSWFAVUPON.REV <br />