Laserfiche WebLink
DRAFT - FOR REVIEW ONLY <br /> This Supplemental Phase II Subsurface Investigation report was prepared by Versar for B <br /> of A and Bank of Stockton. Mr. Vernon P. Elarth supervised the drilling operations and prepared <br /> this report. Mr. Tim Berger, California Registered Geologist No. 5225, supervised the field <br /> operations and the preparation of this report. <br /> Prepared By: Approved for Release By: <br /> final to be signed final to be signed <br /> Vernon P. Elarth Tim Berger, R.G. 5225 <br /> Associate Geologist Senior Geologist <br /> Environmental Management Division Environmental Management Division <br /> -98/3 622-50 1/Sep04'97 ES-2 <br />