Laserfiche WebLink
P 2 of 2 <br /> -7 <br /> Versar Inc. DRILLING LOG PROJECTNO. 3622-501 <br /> Supervising Geologist: Tim Berger,R.G.No.5225 Site Name: Bank of America-Ripon <br /> Log By: Vernon P.Elarth Boring No: BH-8 <br /> Date: 08/06/97 Boring Diameter: 2 inches <br /> Drilling Contractor: Vimnex Boring Depth: 30 feet bgs <br /> Contractor Lic.No. C57-705-927 Boring Location: Across Third Street to the west of <br /> Rig Type: Geoprobe 5400 the B of A property <br /> Driller: <br /> USCS SOIL DESCRIPTION <br /> SOIL CONDITION AND GEOLOGIC INTERPRETATION <br /> U <br /> iti � v <br /> SOIL TYPE,ROUNDING,SORTING,PERCENT:GRAVEL,SANDS,FINES <br /> COLOR,MOISTURE,DENSITY,SECONDARY POROSITY,ODORS,STAINING <br /> > ° 4 GEOLOGY:FILL,ALLUVIUM,BEDROCK v <br /> 24 <br /> 26 First water encountered at 26 feet b s. <br /> 28 <br /> 30 End of borehole at 30 feet bas. Water sample collected with tubing. <br />