Laserfiche WebLink
11/0$196 19:58 PRODUCTION OPERATORS 3 912094640138 NO.405 P002 <br /> �J <br /> Cl SANUP PROCESS <br /> PCH propos the fdlovAng plan for deanup of the Md)onald Island compressor site. <br /> A site grid will be devdoped for the areas around the former compressors and <br /> the old waste storage area. %mples vAl be od!leted at various points and <br /> analyzed to ensure that all amtantruation has been identified. Contaminated soil <br /> will be wmavated from the area. Excavation service gill he provided by SW <br /> Industrial. <br /> The excavaW sal will be placed in container for slipment. If sufficient <br /> container space is not available, the so0 M] be placed in a temporary holctng <br /> area aval4ng transfer. The teparary containment VW1 cwwist liner <br /> under the oontantnabed soil and plastic c overtrtg to prevent <br /> wM <br /> rain. <br /> The current plan for hancOing of the cont;Rminated materials includes <br /> mon to TIPS Tedrdogic:s(thermal de= ton traeatyertt) in Mchmond. <br /> Based on the dila provided to TPS, the nmterW is suitable for treatmartt at the <br /> facility. AdMonal analytical wale will be oonducted for compete v ast+e <br /> chamcimization prior toshipment. <br /> POl w.11 collect samples as the corrtarninated soil is remDved. The soil will be <br /> analyzed for petroleum hydrocarbon, eMylerts glycol, BTIDC and VOC content to <br /> determine if the target deanup level has been rte. <br /> Ia will fow a mobile laboratory Ori-site Labs(certified by the State of <br /> California) at the faal"sty. The lab will conduct analysis as the contaminated seal <br /> is rerrrmA <br /> After the mile laboratory ung indicates that target levels have been <br /> reached, adsritional samples will be taften and sent to a state certified laboratory <br /> for veAcation testing. <br /> Pa wAll have an individual with technical expertise on the site during this <br /> process. Th# representation will be either a environmental consultant or a <br /> njernbsr of the p01 Fleafitt, Safety&Enmirorm staff. <br /> POI will sdhedute these adMbes so that San Joaquin county affrtids and <br /> PG&E reproves can be present during operations. <br /> If these plans are awe, p01 mWd like to rnonre farasard on the renvXfation <br /> process as soars as possible. Please owtta t me with any comments or questions. <br /> Regards, <br /> Clay Reavis <br /> Heim, Safety & Environment Manager <br />