Laserfiche WebLink
i <br /> -TS Environmental, Project 301 <br /> PAGE 1 <br /> 1 . 0 SCOPE OF WORK <br /> The following additional scope of work has been developed to <br /> achieve the purpose of this investigation: " <br /> 1 . Drill, soil sample, and log bimo soil borings to ground water. <br /> Soil samples will be tested for hydrocarbon constituents using <br /> EPA method <br /> g-2AD ac p i D 5432 <br /> 2. Drill, Soil 'sample, log, "complete, develop and sample one <br /> monitoring well to a total depth of first encountered ground <br /> water plus ten feet. Ground water samples will be analyzed for <br /> hydrocarbon constltL <br /> auts us i_.q L A method f 24 . <br /> 348 . Prepare a. report summarizing the findings, conclusions, and <br /> recommendations for further action, if necessary. <br /> 2.0 SCHEDULE 1h �`�`��`bMt ' <br /> Work outlined in this workplan can commence immediately <br /> after approval from the San Joaquin Local Health District has been <br /> obtained. <br /> It has been anticipated !,that the field work .can be completed <br /> within five working days which includes all soil borings, monitoring <br /> well installation and completion and development and sampling <br /> routines. <br /> 3. 0 REMARKS AND SIGNATURES <br /> This supplemental workplan has been prepared using industry <br /> standard procedures and represents our professional geologic opinions <br /> based on such standards. All work is to be conducted in a pro- <br /> fessional manner according to: the established protocol established <br /> in the original workplan (Appendix A) . <br /> �i <br /> This workplan was prepared by: <br /> Daniel L. Anderson Date <br /> Project Geologist/Manager <br /> x. <br />