Laserfiche WebLink
Northwest Pipe Spill Prevention, Control, and Countermeasure (SPCC) Plan 60 <br /> Company Tracy Plant <br /> Mwil west Pipe <br /> �--. Company <br /> SPCC PLAN ANNUAL INSPECTION CHECKLIST (CONTINUED) <br /> DRAINAGE <br /> Yes No NA <br /> Are drainage ditches and culverts free of debris,trash, etc? <br /> Are storm drain outlets adequately protected from erosion? <br /> Remarks (Describe other problems or potential problems that may pose a hazard) <br /> Completed copies of this form shall be kept with the SPCC Plan for a minimum of <br /> 3 years. <br />