Laserfiche WebLink
MONITORING WELL INSTALLATION REPT <br /> Date: CONSTRUCTION <br /> Premise Address: Total Depth <br /> Screen Length (from) (to) <br /> Well No.: Filter Pack (from) (to) <br /> Bentonite (from) (to) <br /> Inspector: Grout (from) (to) <br /> Drilling rig type <br /> Permit No. Auger O.D. I.D. <br /> Completion - Stove pipe/cluistie box (circle one) <br /> Drilling Company: <br /> Driller: casing <br /> height <br /> Consultant <br /> Geologist A80VE GROUND <br /> 00hPLETION CWLE-BOX <br /> COQMPLETION <br /> SPECIAL PERMIT INFO. Ground Surf"' <br /> Distance to sewer line grout <br /> Domestic well on site - (y/ n) �_ft. <br /> If yes, location and distance - tt, <br /> = a <br /> = c <br /> — o <br /> SAMPLING slotted _ c <br /> secion — <br /> Holding Temperature = gravel paac <br /> Method Y <br /> Screening Method > =_ <br /> Tracking Sheet - (y/ n ) >. <br /> SPOILS <br /> Storage Method MATERIALS/DEVELOPMENT <br /> Contamination Noted - (y/ n ) <br /> Storage Location Casing type <br /> Blank ft. Screen h. <br /> Slot size <br /> GROUTING Bags cement <br /> Buckets bentonite <br /> Depth to water Bags sand/gravel <br /> Mix Ratios Filter Pack type/size <br /> Installation Method Surge Block: - (y/ n ) <br /> Quantity Installed Discussed with geologist: - (y/ n ) <br /> Type of method <br /> EH 29 29 <br />