My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
437
>
3500 - Local Oversight Program
>
PR0541875
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2020 11:36:44 PM
Creation date
3/16/2020 2:10:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0541875
PE
2960
FACILITY_ID
FA0024017
FACILITY_NAME
CHEVRON SITE 306415
STREET_NUMBER
437
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
1392417
CURRENT_STATUS
01
SITE_LOCATION
437 E MINER AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AM <br /> OW&I-MOF ST <br /> OCKTON <br /> Ago <br /> FDEPARTMENT OF PUBLIC WORKS r f" <br /> CITY HALL - COP 425 N. EL DORADO STREETSTOCKTON. CA 95202-1997 <br /> october9, 1998 <br /> Arcadis Geraghty & Miller <br /> Reinhard Ruhmke <br /> 1400 N. Harbor Blvd., Suite 700 <br /> Fullerton, CA 92835 <br /> REVOCABLE PERMIT REQUEST FOR GROUNDWATER MONITORING WELLS <br /> The permitting process required in the City of Stockton for installation of groundwater <br /> monitoring wells is a two phase process. First, a Revocable Permit must be issued, <br /> wherein the City grants permission to the property owner to install and maintain a private <br /> well within the City's right-of-way. Second, an Encroachment Permit is issued which allows <br /> the actual construction of the well to be carried out in our right-of-way. <br /> In order to issue the Revocable Permit the City requires the following: <br /> 1. A formal written request for a Revocable Permit in which you acknowledge that you <br /> have read and understand the City's Standard Conditions Applicable to Revocable <br /> Permits. An acceptable application form and copy of the Standard Conditions are <br /> enclosed. <br /> 2. A processing fee payable to the City of Stockton in the amount of$310.00. <br /> 3. A detailed work plan including a sketch showing the location of the proposed well(s). <br /> 4. A Faithful Performance Bond, or other acceptable form of financial security, in an <br /> amount of$500.00 per well will be required. This bond shall remain in effect for as <br /> long as the well remains in the City's right-of-way. <br /> 5. A certificate of insurance naming the City as additional insured. Insurance is <br /> required for the agency obtaining the Revocable Permit and the agency obtaining <br /> the Encroachment Permit. A sample form of the certificate is enclosed. Note the <br /> limits are higher than shown in the Standard Conditions. <br /> "STOCKTON...CALIFORNIA'S SUNRISE SEAPORT" <br />
The URL can be used to link to this page
Your browser does not support the video tag.