My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
437
>
3500 - Local Oversight Program
>
PR0541875
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2020 4:42:27 PM
Creation date
3/16/2020 2:11:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0541875
PE
2960
FACILITY_ID
FA0024017
FACILITY_NAME
CHEVRON SITE 306415
STREET_NUMBER
437
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
1392417
CURRENT_STATUS
01
SITE_LOCATION
437 E MINER AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> TABLE 1 <br /> WELL CONSTRUCTION DETAILS AND PROPOSED WELL DESTRUCTION METHOD <br /> Former Unocal#0187 <br /> Chevron Site ID 306415 <br /> 437 East Miner Avenue <br /> Stockton,California <br /> Top of <br /> Casing Total Casing Boring Screen Bentonite <br /> Location Elevation Depth Diameter Diameter Interval Filter Pack Seal <br /> Itlenliflcatlon Note Date ((eat AMSL) (fee[bgs) (Inches) Casing Material (Inches) (feet bgs) (feet bgs) (feet bgs) Proposetl Method of Destmclion <br /> Soil Va or Probes <br /> SVP-1A 1 1127/09 13.34 6 114 Nylon Tubing 4 5.33-5.66 5-6 4-5 hand-auger <br /> SVP-iB 1 1129/09 13.53 20 1/4 Nylon Tu Ing 8 19-19.33 18.5-20 17.5-18.5 Wer-drill <br /> SVP-2A 1 1127/09 13.29 5 1/4 Nylon Tubing 4 4.33-4.66 4-5 3-4 hand-auger <br /> SVP-2B 1 MN 13.15 20 1/4 Nylon Tubing 8 19-19.33 18.5-20 1T5-18.5 Wer-drill <br /> SVP-3A 1 127109 13.52 5.5 114 Nylon Tubing 4 5-5.33 4.5-5.5 35-4.5 hand-auger <br /> SVp3B 1 1/30/09 13.55 20 1/4 Nylon Tubing 8 19-19.33 18.5-20 17.5-18.5 Over-drill <br /> SVP4A 1 127/09 13.98 5 1/4 Nylon Tubing 4 4.33-4.65 4-5 3-4 hand-auger <br /> SVPdB 1 212/09 13.89 20 1/4 Nylon Tubing B 19.33-19.66 19-20 18-19 Over-drill <br /> SVP-5A 1 127/09 14.19 6 1/4 Nylon Tubing 4 5.33-5.88 5-6 4-5 hantlau er <br /> SVP-5B 1 1/30/09 1 14.00 1 20 1 1/4 1 Nylon Tubing 1 B 1 1933-19.66 19-20 1 18-19 L Over-drill <br /> SVPSA 1 127M9 14.16 7 1/4 Nylon Tubing 4 633-6.66 6-7 5-6 hand-auger <br /> er <br /> SVPSB 1 129/09 14.27 20 1/4 Nylon Tubing6 1933-19.66 19-20 18-19 Dyer-dnll <br /> SVP-7A 1 127/09 14.06 6 1/4 Nylon Tubi 4 5.33-5.66 5-6 4-5 hand-auger <br /> er <br /> SVP-7B 1 129/09 1403 20 1/4 Nylon Tubing8 1933-19.65 19-20 18-19 OverAnII <br /> SVP-8A 1 129/09 14.11 7 1/4 Nylon Tubi 4 6.33-6.66 6-7 5-6 hand-auger <br /> er <br /> SVP-BB 1 129/09 14.17 20 1/4 Nylon Tubing8 19.33-19.66 19-20 18-19 OverArl <br /> Injection Wells <br /> 41, nmary:41- <br /> IW-1A 2 12/9/10 1358 52 2 PVC/Steel Wire' 8 42-52 52Well Detonation <br /> 64,Primary: <br /> IW-1B 2 12/10/10 13.57 75 2 PVC/Steel Wire' 8 65-75 75Well Detonation <br /> 41,Primary:41- - <br /> IW-2A 2 12/9/10 13.79 52 2 PVC/Steel Wire' 8 42-52 52 Well Detonation <br /> 64Primly:64- <br /> IW-2B 2 12/10/10 13.77 75 2 PVC/Steel Wire 8 65-75 75 - <br /> Well Detonation <br /> 41 Primary:41- <br /> IW-3A 2 12/13/10 13.54 52 2 PVC/Steel Wire' 8 42-52 52 _ Well Detonation <br /> 64 Primary:64- <br /> IW-3B 2 12/13/10 13.55 75 2 PVC/Steel Wire' 8 65-75 75 - <br /> Well Detonation <br /> 41 Pdmary:41- <br /> IW4A 2 12/15/10 13.45 52 2 PVC/Steal Wire' 8 42-52 52 Well Detonation <br /> 64 Primary:64- <br /> IW-0B 2 12/14/10 13.36 75 2 PVC/Steel Wie 8 65-75 75 - <br /> Well Detonation <br /> 41 Primary:41- <br /> IWSA 2 1/27/11 13.18 52 2 PVC/Steel Wire' 8 42-52 52 _ Well Detonation <br /> 24 Primary:24- <br /> IW-5K 2 1121Y11 12.99 35 2 PVC/Steel Wre' 8 25-35 35Well Detonation <br /> 64 Pnmary:64- - <br /> IW5B 2 12/16110 13.08 75 2 PVC/SIeeI Wire' 8 65-75 75Wall Detonation <br /> many: <br /> IW-5B' 2 12116/10 12.97 60 2 1 PVCISteel Wire' 8 55-60 60 Well Detonation <br /> O.one SpargeWells <br /> SP-1A ll/1100 70 3/4 PVC w/Stage Poin 8 fib-69 65-70 61-65 Well Detonation <br /> SPAS 11/1100 119 314 PVC wtSparge Poin 8 116.5-119 115-119 70-115 Well Detonation <br /> SP-1C 2/11102 45 314 PVC w/Sparge Poi 8 42.5-45 40-45 35-40 Well Detonation <br /> SP-2A 11/6/00 120 3/4 PVC w/Sparge Poin 8 117.5-120 116.5-120 113.5-116. Well Detonation <br /> SP-2B 11/8100 75 3/4 PVC w/Sparge Poi 8 73-75 71-75 67-71 Well Detonation <br /> SP-3A 11RMD 120 3/4 PVC w/Sparge Poi n 8 1175-120 116.5-120 113-116.5 Well Detonation <br /> SP-3B 11/8/00 75 3/4 PVC w/Stange Poin 8 725-75 71-75 67-71 Well Detonatton <br /> SP-3C 2/11/02 45 3/4 PVC w/Barge Poi n B 42.5-45 40-45 35-40 Well Detonation <br /> SP-4A 110100 120 3/4 PVC w/Stage Pon 8 116.5-119 114,5-120 110.5-114. Well Detonation <br /> SP-4B 1118/00 72 3/4 PVC w/Sponge Poin 8 69.5-72 W8 72 64-68 Well Detonation <br /> SP-5A 2/12/02 111.5 3/4 PVC w/S a e Poin 8 107.5-110 105-111.5 100-105 Well Detonation <br /> SP-5B 2/13102 65 3/4 PVC w/Sa ePoin 8 62.5-65 60-65 55-60 Well Detonation <br /> SP-SC 2/13102 40 3/4 PVC w/Sparge,Poin 8 37.5-40 35-40 30-35 Well Detonation <br /> SP-6A 2/14102 111 3/4 PVC w/Sparge Poi 8 107.5-110 105-111 100-105 Well Detonation <br /> SP-fie 2/15102 65 3/4 PVC w/S ePoi 8 62.5-85 80-65 55-60 Well Detonation <br /> SPEC WSM2 40 314 PVC w/Stage Poi 8 37.5-40 35-40 30-35 Wall Detonation <br /> 4829.5 <br /> Notes: <br /> 1 Elevation is referenced to North American Vertical Datum of 1988. <br /> C9UsemWwzWppDOWa OapMicrosoa\Wlndows%Tempomry IMemel F1lMZontem.0u11ookVllDTa5El\Tablet-soil Boring and Well ConstmGlon Details 300415dsn 2of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.