Laserfiche WebLink
Page 2 of 2 <br /> Assessment workplan dated June 1, 2006. This work plan was approved by you on June 22, 2006. Only <br /> one soil gas sample will be collected from each boring. Seven soil vapor samples will be collected at five <br /> feet (ft) below ground surface(bgs). The additional seven soil vapor samples will be collected at 10 ft bgs. <br /> I have attached a copy of the work plan for your reference. <br /> I will be sending a new site map indicating the placement of the soil gas borings in a future e-mail. <br /> Please respond with a written approval for this change in the scope of work for the Additional Soil and Soil <br /> Gas Assessment work plan.' <br /> Regards, <br /> Nichole Pagano <br /> Staff Geologist <br /> Health and Safety Coordinator <br /> ENSR Corporation <br /> 300 Lakeside Drive, Suite 220 <br /> Oakland, CA 94612 <br /> Direct: 510-350-9981 <br /> Fax: 510-350-9988 <br /> nnaaano ensr.aecom.com <br /> 9/20/2006 <br />