Laserfiche WebLink
Ozone Microsparge System Pilot Test Status Report,Former Unocal Service Station No 0187, Stockton,CA <br /> April 28,2003 <br /> Depth to water in the wells ranged from 23 15 to 52 63 feet below top of casing (btoc), and overall <br /> groundwater flow was to the northeast at gradients ranging from 0 003 to 0 009, which is consistent with <br /> recent historical data Since August 1994, groundwater beneath the site has nsen steadily from a depth of <br /> approximately 48 feet btoc to its present level <br /> OZONE MICROSPARGE SYSTEM PILOT TEST <br /> System Installation <br /> As a remedial action measure, GR installed an ozone microsparge (C-SpargeTM) system Ozone <br /> microspargmg is a process where ozone is entrained in air and introduced into the groundwater at low <br /> flow rates (2-6 cubic feet per minute) through specially designed sparge points to create small <br /> "microbubbles " As these microbubbles rise within the column of water, they strip volatile organic <br /> compounds (VOCs) from the groundwater Upon entering the microbubbles, the VOCs are rapidly <br /> oxidized The system installed at this site was considered a pilot test to evaluate the effectiveness of the <br /> C-Sparge system The system was operated continuously except for brief down times due to faulty <br /> electrical wiring and tubing failures <br /> In November 2000,eight on-site ozone microsparge wells(SP-1A, SP-113, SP-2A, SP-213, SP-3A, SP-313, <br /> SP-4A, and SP4B) were installed at the site The ozone microsparge wells were installed in four sets of <br /> two wells each, with each set consisting of wells set at 75 and 120 feet bgs <br /> Eight additional ozone microsparge wells(SP-1C, SP-3C, SP-5A,B,C and SP-6A, B, C)were installed at <br /> the Unocal site on February I 1 through 19, 2002 (GR report#240042 11-1, Monitoring Well and Sparge <br /> Point Installation Report, dated July 15, 2002) Based on the manufacturer's recommendations, an <br /> approximate zone of influence of 20 feet for each point was used as minimum radius of influence Two <br /> of the points were placed at a depth of approximately 40 feet bgs, two points were placed at a depth of <br /> approximately 45 feet bgs,two points were placed at a depth of approximately 65 feet bgs,and two points <br /> were placed at a depth of 110 feet bgs The sparge point depths and locations were chosen to introduce <br /> ozone into the areas of highest petroleum concentrations The point locations are shown on Figure 2 The <br /> second system was placed into operation on April 26, 2002 <br /> The C-SpargeTM panels include an ozone generator, air compressor,and a programmable timer/controller <br /> Sparge points are connected to the panel by LDPE tubing Each sparge point has a dedicated line The <br /> tubing was run through Schedule 40 PVC conveyance piping for added protection <br /> System Operation <br /> The system cycles ozone/air infection between sixteen specially designed micro-sparge points The <br /> schedule was initially set to cycle through each point 18 times per day, for nine minutes per point per <br /> cycle There is an eight minute rest penod between cycles This schedule was varied over the course of <br /> the test as part of the system evaluation process to provide more treatment to some areas <br /> 24004211-2 4 <br />