My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012113
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
437
>
3500 - Local Oversight Program
>
PR0541875
>
ARCHIVED REPORTS_XR0012113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2020 5:38:45 PM
Creation date
3/16/2020 2:38:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012113
RECORD_ID
PR0541875
PE
2960
FACILITY_ID
FA0024017
FACILITY_NAME
CHEVRON SITE 306415
STREET_NUMBER
437
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
1392417
CURRENT_STATUS
01
SITE_LOCATION
437 E MINER AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ElhRite <br /> 1 <br /> • Ms. Margaret Lagorio <br /> ' October 14, 2004 <br /> Page 4 <br /> 1 documentation are included as Attachment C. Cumulative groundwater sampling analytical <br /> results for wells U-3 and U-10 and piezometers NP-1 and NP-2 are summarized in Table 9. <br /> Graphs of concentrations of TPHg and benzene versus time in wells U-3 and U-10 and <br /> ' piezometers NP-1 and NP-2 are included as Attachment D. <br /> Discussion <br /> 1 During August 2004, flow ports were installed on all sparge lines to monitor the volume of 03 <br /> being delivered to each sparge point. The average flow of 03 being delivered to each sparge <br /> point is approximately 1.22 standard cfm. <br /> ' Overall depth to water measurements in the vicinity of the site show an increasing trend. The <br /> increasing demand for groundwater in the San Joaquin Valley appears to be effecting the <br /> 1 groundwater table elevation beneath the site. Sparge points SP-5C and SP-6C, screened <br /> across groundwater zone A, may have to shut down in the near future in order to optimize to the <br /> remediation system. <br /> ' Recommendations <br /> ' ENSR recommends that operation of the ozone microsparge system continue and further <br /> groundwater sampling and D.O. monitoring be performed to evaluate the system's <br /> effectiveness. <br /> ' Future Work <br /> The fourth quarter groundwater monitoring and sampling is currently scheduled for October <br /> ' 2004. <br /> Remarks/Signatures <br /> The interpretations in this report represent our professional opinions and are based, in part, on <br /> p p p <br /> the information supplied by the client. These opinions are based on currently available <br /> ' information and are arrived at in accordance with currently accepted hydrogeologic and <br /> engineering practices at this time and location. Other than this, no warranty is implied or <br /> intended. <br /> 1 <br /> • JAProjects10694010187-3251FinailReport0rd Qtr 04-QMR RSR10187 3rd Qtr 04-QMR RSR.doc <br /> Celebrating 35 Years of Excellence in Environmental Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.