Laserfiche WebLink
STANDARD OPERATING PROCEDURE - <br /> . GROUNDWATER SAMPLING <br /> Gettler Ryan Inc, field personnel adhere to the following procedures for the collection and handling <br /> of groundwater samples prior to analysis by the analytical laboratory. Prior to sample collection, the <br /> type of analysis to be performed is determined. Loss prevention of volatile compounds is controlled <br /> and sample preservation for subsequent analysis is maintained. <br /> Prior to sampling, the presence or absence of free-please hydrocarbons is determined using a bi1�C <br /> flezi-dip interface probe. Product thickness, if present, is measured to the nearest 0.01 foot and is <br /> noted in the field notes. In addition, static water level measurements are collected with the interface <br /> probe and are also recorded in the field notes. <br /> After water Ievels are collected and prior to sampling, each well is purged a minimum of three well <br /> casing volumes of water using pre-cleaned pumps (stack, suction, Grundfos), or polyvinyl chloride <br /> bailers Temperature, pH and electrical conductivity are measured a minimum of three times dung <br /> the purging Purging continues until these parameters stabilize <br /> Groundwater samples are collected using disposable bailers The water samples are transferred tiam <br /> the bailer into appropriate containers Pre-preserved containers, supplied by analytical laboratones, <br /> . are used when possNe When pre-preserved containers are not available, the laboratory, is instructed <br /> to preserve the sample as appropriate Duplicate samples are collected for the laboratory to use in <br /> maintaining quality assurance/quality control standards The samples are labeled to include the job <br /> number, sample identification, collection date and time, analysis, preservation (if any), and the sample <br /> collector's initials The water samples are placed in a cooler, maintained at 4cC for transport to the <br /> laboratory Once collected in the field, all samples are maintained under chain of custody until <br /> delivered to the laboratory <br /> The chain of custcdy document includes the job number, type of preservation, if any, analysis <br /> requested, sample identtfication, date and time collected, and the sample collector's name The chain <br /> of custody is signed and dated (including time of transfer) by each person who receives or surrenders <br /> the samples, beginning with the field personnel and ending with the laboratory personnel. <br /> A laboratory supplied tnp blank accompanies each sampling set For sampling sets greater than 20 <br /> samples, 57a trip blanks are included. The trip blank is analyzed for some or all of the same <br /> compounds as the groundwater samples <br /> As requested by Unocal Corporation, the purge water and decontamination water generated during <br /> sampling activities is transported to Tosco - San Francisco Area Refinery, located in Rodeo, <br /> California. <br /> • Mt0r %Un0C113Qp ftm.[/93 <br />