Laserfiche WebLink
INC.GETTLER - RYANN <br /> February 18, 1999 <br />' G-R Job #280045 <br /> Mr. Robert A Boust <br />' Unocal - DBG/AMG <br /> 2121 North California Boulevard, Suite 250 <br /> Walnut Creek, California 94596 <br /> 1 <br /> RE First Quarter 1999 Groundwater Monitoring & Sampling Report <br /> Former Unocal Service Station #0187 <br /> 437 East Miner Avenue <br /> Stockton, California <br /> Dear Mr Boust <br /> This report documents the development and quarterly groundwater monitoring and sampling events performed <br /> by Gettler-Ryan Inc (G-R) On February 1, 1999, field personnel developed three wells (NP-2-22, NP-2-60 <br /> and NP-2-116) On February 5, 1999, field personnel monitored sixteen wells (U-1 through U-9, UV-1, NP-1- <br /> 22, NP-1-65, NP-1-111, NP-2-22, NP-2-60, and NP-2-116) and sampled fifteen wells (U-1 through U-9, NP-1- <br /> 22, NP-1-65, NP-1-111, NP-2-22, NP-2-60, and NP-2-116 ) at the above referenced site <br /> Static groundwater Ievels were measured and all wells were checked for the presence of separate-phase <br /> hydrocarbons Separate-phase hydrocarbons were not present in the wells Static water level data and <br /> groundwater elevations are summarized in Table 1 A Potentiometric Map is included as Figure 1 <br /> 1 Groundwater samples were collected from the monitoring wells as specified by G-R Standard Operating <br /> Procedure - Groundwater Sampling (attached) The field data sheets for both events are also attached The <br />' samples were analyzed by Sequoia Analytical Analytical results are summarized in Tables 1 through 5 A <br /> Concentration Map is included as Figure 2 Chain of custody documents and laboratory analytical reports are <br /> also attached <br />' Sincerely, <br /> 040 <br /> ' Deanna L Harding Q�EN J Cq9 �'^ <br /> Project Coordinator Q 03 �% <br /> ' No. 5577 <br /> Stephen J Carte <br /> Senior Geologist, R G No 5577 <br /> 9TFOF CAL�FOQ� <br /> ' 6747 Sjerra Court , Suite J Dublin , California 94568 ( 925 ) 551 - 7555 <br />