Laserfiche WebLink
1 <br /> ADDENDUM <br /> 1 <br /> 1 <br /> Please note that there have been a number of datum adjustments in the City of Stockton throughout <br />' the years One of the reasons for this is that the aquifer as being pumped down continuously and the <br /> land is subsiding Therefore,the datum that Arcadis Geraghty&Miller provided Field Designs for <br /> the E Miner Avenue site was incorrect We have used the current City datum for both the E Miner <br /> and N Pacific sites, and you will find a descrepancy between our work and the previous work done <br /> by Virgil Chavez, P L S <br />' The addendum includes sax additional pages which were obtained from Robert E Chesner,the City <br /> Surveyor <br /> 1 <br /> 1 <br /> 1 <br />