Laserfiche WebLink
Site Safety Plan, Project#240042 08 <br /> September 28, 2000 <br /> SITE SAFETY WORK PLAN: <br /> PERIMETER PROTECTION Perimeter protection will be provided by the contractor <br /> and Gettler-Ryan (1 a safety cones) <br /> PERSONAL PROTECTION EPA Level D <br /> Modifications latex gloves, hard hats, safety vests, <br /> and steel toed boots <br /> Surveillance equipment- PID <br /> DECONTAMINATION Personal wash thoroughly with detergent solution and <br /> water <br /> Equipment wash thoroughly with detergent solution <br /> and water, or steam clean <br /> FIRST AID As applicable. At least one member of crew will have <br /> current first aid/CPR certification <br /> WORK LIMITATIONS None <br /> INVESTIGATION-DERIVED <br /> MATERIAL DISPOSAL All drill cuttings will be placed on and covered with <br /> plastic sheeting at the site pending disposal Der-on <br /> water will be stored in properly labeled drums pending <br /> disposal <br /> TEAM COMPOSITION <br /> Foreman/Safety Officer David Herzog, G-R <br /> Subcontractors Cascade Drilling <br /> EMERGENCY Ambulance: 911 <br /> Fire Department- 911 <br /> Sheriff/Highway Patrol 911 <br /> TELEPHONES Mobile unit will be onsite <br /> is <br /> SITE RESOURCES Fire extinguisher <br />