Laserfiche WebLink
CONTENTS <br /> INTRODUCTION 1 <br /> SITE DESCRIPTION AND BACKGROUND 2 <br /> Site Description . . . . . . 2 <br /> Previous Environmental Work 2 <br /> Soil and Groundwater Conditions 3 <br /> PROPOSED SCOPE OF WORK . . 4 <br /> Task I Limited Phase I Site Assessment . . 5 <br /> Task 2 Pre-Field Activities . . . . 5 <br /> Task 3 Field Activities 5 <br /> 31 Soil Borings . . 5 <br /> 32 Vapor Extraction Wells 6 <br /> 3 3 Groundwater Monitoring Wells . . 6 <br /> 34 Wellhead Survey . . . . 6 <br /> 3 5 Well Development and Sampling . . 7 <br /> 3.6 Laboratory Analysis . . 7 <br /> Task 4 Office Activities 7 <br /> • SCHEDULE 8 <br /> DISTRIBUTION 8 <br /> PROJECT STAFF . . . . . . 8 <br /> REFERENCES . . 9 <br /> FIGURES <br /> Figure 1 Vicinity Map <br /> Figure 2. Site Plan <br /> Figure 3. Extended Site PIan <br /> Figure 4 Vapor Extraction Wells - Proposed Construction Details <br /> Figure 5 Groundwater Monitoring Wells - Proposed Construction Details <br /> APPENDIXES <br /> Appendix A. GSI Field Methods and Procedures <br /> Appendix B Site Safety Plan <br /> GeoStrategies Inc. <br />