Laserfiche WebLink
Project No. 034-17016 <br /> Site-Specific Health& Safety Plan <br /> Page No.24 <br /> personnel will include those who have duties requiring their presence in the work zone, have received <br /> appropriate health and safety training,and whose background medical records may be obtained to verify that <br /> the health of that individual is not at extreme risk by his/her presence. <br /> 7.0 DECONTAMINATION PROCEDURES <br /> The initial drilling and sampling activities will be conducted at areas where petroleum hydrocarbon <br /> contaminated soils,sludges,liquids and/or vapors are anticipated. Due to the volatile nature of the petroleum <br /> hydrocarbons that may be encountered during the initial drilling and sampling operations,decontamination of <br /> equipment and vehicles will be of minimal importance since the volatile hydrocarbons will rapidly vaporize. <br /> However,contaminated sampling equipment and any obvious contaminant accumulations will not leave the <br /> project site. Field team members will also abide by the following guidelines to ensure that contaminants will <br /> not remain in contact with their body. <br /> • Personnel involved in the field portion of this investigation will be instructed to wash their hands, <br /> face,neck,and arms at the end of the work day. Krazan will assure the presence of soap,water and <br /> towels at the drilling site for this purpose. Crews will be instructed to shower at their home or lodge <br /> at the end of the workday. <br /> • No eating, drinking, smoking,or chewing of gum or tobacco will be permitted in the work zone. <br /> During this investigation,the nature of materials handled and the extent of contamination may require formal <br /> decontamination procedures and delineated work/clean zones. At the discretion of the Task Leader, the <br /> following work zones and decontamination procedures will be used to minimize the transfer of hazardous <br /> substances from the site so as to protect the environment and public health. <br /> 7.1 Work Zones <br /> The field team shall prevent the uncontrolled movement of waste materials or hazardous substances from the <br /> drilling site. The team will prevent migration of site contaminants by using the following work zones and <br /> equipment/personnel decontamination procedures. <br /> Exclusion Zone: A circle around any given borehole will be defined before drilling starts. In most cases,the <br /> zone will be"roped off'with an applicable barricade tape. This designated area will constitute the"Exclusion <br /> Zone." This zone is where potentially hazardous surface contaminants as a result of our investigation and <br /> physical hazards to the workers will be contained. Personal protection equipment will be required in this area <br /> according to the discretion of the Task Leader and/or in accordance with the guidelines contained in this plan. <br /> The size of the Exclusion Zone may be changed to accommodate site conditions and to ensure contaminant <br /> KRAZAN&ASSOCIATES,INC. <br /> With Offices Serving the Western United States <br /> 03417016 SSI Lathrop HASP Final.doc <br />