My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MCKINLEY
>
16888
>
2900 - Site Mitigation Program
>
PR0541959
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 2:44:44 PM
Creation date
3/16/2020 4:17:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541959
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0024078
FACILITY_NAME
SUPER STORE INDUSTRIES
STREET_NUMBER
16888
STREET_NAME
MCKINLEY
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19816026
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
16888 MCKINLEY AVE LATHROP 95330
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> All soil samples will be submitted for analysis for total petroleum hydrocarbons Diesel Range Organics(TPH- <br /> DRO), TPH gasoline range organics(TPH-GRO), volatile organic compounds via EPA Method 8260, and <br /> polyaromatic hydrocarbons. Select samples collected near the used oil UST and oil/water separators will <br /> also be analyzed for one or more additional analysis including polychlorinated biphenyls and total CAM 17 <br /> metals. Groundwater samples will be analyzed for TPH-DRO, TPH-GRO and VOCs via EPA method 8260. <br /> Additional Quality Assurance/Quality Control(QA/QC)samples will also be collected to include submission <br /> of a trip blank for VOCs, blind duplicate, field/equipment blank, and a matrix spike/matrix spike duplicate for <br /> each analysis performed. <br /> Soil vapor samples are proposed to be collected adjacent to the two fuel dispenser locations, and at one <br /> location near the used oil UST. Soil vapor samples will be collected by drilling a small diameter hole in the <br /> concrete pad adjacent to each dispenser and installing a soil vapor point The soil vapor sample will be <br /> collected into summa canisters and consist of grab samples. Each sample will be analyzed for VOCs via <br /> EPA method TO-15. <br /> Additional waste characterization sampling will be required to dispose of the investigation derived wastes <br /> contained in 55-gallon drums and may include reactivity, flashpoint, and pH. Additional parameters may be <br /> required depending on the waste profile and disposal facility requirements. Costs for disposal of one 55- <br /> gallon drum, and waste characterization analysis have been included. <br /> At the request of the client, a rush turnaround analysis of 3-days for all samples will be requested.Additional <br /> charges apply. The costs presented include estimated labor, subcontractor costs, and expenses. <br /> Task 3—Report Development <br /> Arcadis will prepare a summary report, which will include a description of field activities, figures, screening <br /> results, laboratory reports, and a discussion of the findings with respect to the results of the laboratory data <br /> results in comparison to screening levels and/or criteria established by the State of California. The costs <br /> presented include estimated labor to prepare the report. <br /> Total <br /> ASSUMPTIONS <br /> For purposes of this amendment, Arcadis assumes the following: <br /> • Access to the site is provided along with use of utilities (water, electrical, restrooms). <br /> • Limited access agreement involvement on Arcadis' behalf. If Arcadis legal is required to review <br /> documentation,then additional costs may apply. <br /> • Copies of detailed site utility plans, and access to current site personnel familiar with the location of <br /> subsurface utilities/features are provided by the owner. Arcadis is not responsible for any damage or <br /> repair to unknown or unmapped utilities. <br /> • Work can be completed during normal business hours. <br /> • A minimum, of 12-hours per day per person for each field day. Which includes mobilization and <br /> demobilization. Scope assumes four total field days. <br /> • All laboratory data will be performed on a rush-turn around basis based on the request of the client. <br /> • One drum of drill cuttings and purge water will be generated for offsite disposal. Assumes the drum can <br /> be temporarily stored onsite until pick-up can be scheduled. <br />
The URL can be used to link to this page
Your browser does not support the video tag.