								         																										•     I.
<br />			1   		2   	2(      3   		4   		5    €I     	6   		7  		^18  		9   		10
<br />   		SUMMARY OF PROPOSED WORK:     CONSTRUCTION NOTES:  											CONTACT INFORMATION:
<br />   		1,  INSTALL(2X)NEW AT SEMI DEEP-DEEP WELL ANODES  															PROJECT MANAGER     -  LARRYCARLOS       (9251787-8390
<br />      		(SD-DWAJ SPACED 31YADJACENT TO 129M NEUGEBAUER RD,    GENERAL REQUIREMENTS:     												PROJECT ENGINEER(PED)   -  RYANWOOD	(92S128S-7838
<br />      		STOCKTON 																		ESTIMATOR/DESIGNER   -  FRANKTOWNSEND     (9251244-321,
<br />    																										244-3234
<br />   		2,  INSTALL A40V-20 A POLE MOUNTED RECTIFIER(MG42218),    1. UNDERGROUNDSERVICE ALERT:       				11.TIE-IN AND CLEARANCE PROCEDURE TO BE PREPARED AND PERFORMED IN ACCORDANCE WITH    LOCAL CORROSION      --  MARCOSOCEGUERA    (510)621-9204
<br />      		ANODE JUNCTION BOX(M301518),RMU,AND AC DISCONNECT.      Call 	A MINIMUM OF 2 BUSINESS DAYS(NOT INCLUDING INITIAL DAY OF 	THE FOLLOWING WORK PROCEDURES:  				SUPERVISOR
<br />      		I
<br />   		3.  NSTALL12 NEWWGROUNDRODSPERGS&SO-11.1   	CONTACT)IHAD VANCE FOR THE MARKING OF UNDERGROUND UTILITIES.INCLUDING ALL  								LOCALCORROSION      --  BILL BELASKI	(209)406-7844
<br />   		4.  NSTALL21#6 NEW CATHODE LEADS TO OS7A.MDI(M290396).     NON-UTILITIES BEFORE YOU DIG,GRADE,OR EXCAVATE.     			A.TD-430OP-01,HOT AND COLD WORK METHODS FOR NATURAL GAS TRANSMISSION PIPELINE     MECHANIC
<br />     	E	CATHODELFADSWILL NEED TO EXTEND FROM ACCESS ROAD TO 								SHUTDOWN AND TIE-IN.      										E
<br />      		POLEMOUNITED ANODE JUNCTION BOX.       	2. UTILITY NOTES:  						e.TD-0141S,GASCLFARANCE PROCEDURES FOR FACILITIES OPERATING OVER 60 PSIG.
<br />   		S.  ANODE WIRES AND NEW CATHODE LEADSTO BE LANDED IN       A DIMENSIONS SHOWN ON THESE DRAWINGS ARE BASED ON THE BEST AVAILABLE INFORMATION
<br />      		NEW ODE
<br /> 			18 PER ANDD WC  			FROM SEVERAL SOURCES,AND SHALL BE VERIFIED IN THE FIELD BY CONSTRUCTION PERSONNEL    12. COATING REMOVAL
<br />   		6.  WI RE WATCHDOG SCOUT RMU(MG42141)TO NEW RECTIFIER	PRI OR TO FABRICATION.
<br />   		7.  INSTALL NEW ELECTRIC SERVICE ON PG&E POLE 120344302.       B.THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE AND LOCATION OF  	A.PERFORM THE FOLLOWING STEPS,IN ACCORDANCE WITH TD-4711P-0I,BEFORE REMOVING
<br />      							UNDERGROUND UTILITIES,PROPERTY LIN ES.AND OTHER SUBSTRUCTURES IS NOT GUARANTEED	ASPHALTICPIPEWRAPON PIPELINES INSTALLED PRIOR TO 1972(BASED ON PG&E ANALYSIS,
<br />      							TO BE ACCURATE OR ALL-INCLUSIVE,UNLESS OTHERWISE NOTED.CONSTRUCTION PERSONNEL	PIPE INSTALLED IN 1972 OR LATER DOES NOT HAVE PIPE WRAP THAT CONTAINS ASBESTOS):
<br />      							ARE RESPONSIBLE FOR MAKING ALL DETERMINATIONS AS TO THE TYPE AND LOCATION OF
<br />      							UNDERGROUND UTILITIES AND OTHER SUBSTRUCTURES AS NECESSARY TO AVOID DAMAGE OR	L WHEN A PIPE WRAP SAMPLE IS REQUIRED TO BE ANALYZED FOR ASBESTOS:
<br />      							ENCROACHMENTS.   						a.CALLER SAMPLE PER TDAMP-01 AND COMPLETE CHAIN OF CUSTODY FORM
<br />     							G PROSPECTING IS REQUIRED AHEAD OF WORK.ALL OFFSETS OR ROPING WILL NEED TO BE		TDd711P-01-FOI.
<br />      							APPROVED BY THE PG&E PROJECT ENGINEER(PED),AND REDUNED DETAILS SHOWN ON PROFILE  	b.FILE PINK COPY OF THE CHAIN OF CUSTODY FORM AND FINAL LABORATORY RESULTS
<br />      							AND CONSTRUCTION DETAIL SHEETS OF EACH ADDITIONAL SUBSTRUCTURE.       		WITH THE AS-BUILTS.
<br />     							D.ALLEXCAVATIONSWITHM EXISTING STATIONS SHALL BE HAND DUG OR EXCAVATED USING SOFT     							REFERENCE DRAWINGS:
<br />      							DIG METHODS(e.g.VACUUM EXCAVATIONS OR SIMILAR).    			2.WHEN REMOVING PIPE WRAP THAT CONTAINS ASBESTOS,OR FOR EMERGENCY WORK,
<br />  															FOLLOW TD4711P-01"PIPE WRAP REMOVAL.HANDLING AND DISPOSAL".
<br />  							3. ELBOWS AND FIELD BENDS:  												OPERATING MAPS
<br />     							A ALL BENDS ARE ELBOWS,EXCEPT WHERE SMOOTH FIELD BENDS ARE SHOWN.FIELD BENDS      CATHODIC PROTECTION NOTES:   								-- 384512,REV61
<br />      							SHALL BE MADE IN ACCORDANCE WITH A-36,SECTION4D.FIELDBENDS MAYBEUSED IN LIEU      							OPERATINGDIAGRAMS
<br />      							OF ELBOWS WHEN PREAPPROVED BY THE PG&E PROJECT ENGINEER(PED).       	1FOLLOW TD-530TH-01 TO DOCUMENT INTERNAL CORROSION AND EXTERNAL CORROSION   				--- 806216,REV3
<br />     							B.IN ORDERTO AVOID EXCESSIVE STRAIN ON THE PIPELINE,THERE SHALL BEA MINIMUM 	.							AS-BUILTS
<br />    	D						SEPARATION OF 5 FEET BETWEEN A ROPED SECTION OF PIPELINE AND ANY ELBOWS OR FIELD	INSPECTION OF THE PIPELINE.  								---- 30972347ASSUILTDWG   p
<br />      							BENDS.  						2. INSTALL ELECTROLYSIS TEST STATIONS IN ACCORDANCE WITH GAS DESIGN STANDARDS
<br />     							C.AELDCONSTIOS.  THE PIANANDPROFILE ARE APPROXIMATEANDSHALL BE CUTTO SUIT       0-10,0-10.1 AND 0.10.2.
<br />      							FIELD CONDITIONS.
<br />  							4. SEPARATION FROM OTHER STRUCTURES:  				3. UPON COMPLETION OF 8ORINGS,CONTACT THE CORROSION SUPERVISOR FOR THE LOCAL
<br />     							A.CROSSING UNDERGROUND FACILMES:PG&E PIPELINE MUST BE INSTALLED WITH AT LEAST 	AREA/DIVISION TO PERFORM CURRENT DRAIN TESTS ON THE PIPELINE SEGMENT THAT
<br />      							24 INCHES OF CLEARANCE FROM ANY OTHER SUBSTRUCTURE/UTIUTY NOT ASSOCIATED WITH       WAS INSTALLED IN THE BORE.THE CURRENT DRAIN TEST MUST BE PERFORMED PRIOR TO
<br />      							THE PIPEUNE UNLESS NOTED ON THE DRAWINGS.      			WELDING PIPE ON EITHER SIDE OF THE BORE.
<br />   		SEQUENCE OF OPERATIONS.    	B.
<br />      							PARALLELING UNDERGROUND FACILITIES:THIS PIPELINE MUST BE INSTALLED WITH AT LEAST     q- FOR THE INSTALLATION OF THE WATCHDOG RECTIFIER REMOTE MONITOR,CONTACT THE
<br />      							5 FEETOFCLEARANCE FROM ANY OTHER UNDERGROUND STRUCTURE/UTILITY NOT ASSOCIATED      CORROSIONTHEINSLLATISORF THE W LOCALGRECTIFIIERRE
<br />   		SEE ABOVE     				WITH THE PIPELINE UNLESS NOTED ON THE DRAWINGS.
<br />  							5. REST ORATION AND CLEAN UP:					5. BONDING CABLES TO BE INSTALLED ACROSS PIPELINE CUT-OUTS AT ALL LOCATIONS THE
<br />     							A RESTORATION Of PUBLIC STREETS,SIDEWALKS,CURBS,ETC.ABOVE PIPE BEDDING SHALL BE IN       PIPELINE IS SEVER ED PRIOR TO REMOVAL.CHAIN CLAMPS,MAGNETIC CLAMPS,OR OTHER
<br />      							ACCORDANCE WITH THE LATEST CITY,COUNTY,OR AGENCY STANDARDS.  		CONSTRUCTION MANAGEMENT APPROVED CLAMPS AND 46(MIN)STRANDED CABLE SHALL
<br />     							B.WHERE EVER THERE ARE ROW CROPS,THE TOPSOIL SHALL BE REMOVED TO A DEPTH OF 12"AND      BE UTILIZED.CLAMPS TO REMAIN IN PLACE UNTIL PIPELINE 15 TIED IN.
<br />      							STORED ON SITZ UPON COMPLETION OF CONSTRUCTION,THE TOPSOIL SHALL BE RESTORED.     RETIREMENT PROCEDURE FOR EXISTING PIPE:
<br />      							TAKE URE TO PREVENT MIXING OF TOPSOIL AND SUBSOIL.
<br />  							6. DESIGN NOTES:       					1. GT&D UTILITY WORK PROCEDURE TD 9500P46,'DEACTIVATION AND/OR RETIREMENT OF
<br />     							A   DRAWING HAS BEEN CREATED BY REVIEW OF THE AS-BUILT DRAWINGS&RECORDS.THIS DRAWUNDERGROUND GAS FACILITIES,'SHALL BE FOLLOWED.
<br />      							ACCURACYIS DEPENDENT UPON THE SOURCE DOCUMENT USTEDON THE REFERENCE
<br />      							DRAWINGS       					2. THEEXISTING PIPE SECTIONS SHALL HAVE FREE LIQUIDS REMOVED AND BE 100%PURGED C       					B.PIPE 8 FITTING SEPCIFICATIONS WITH ASTERISK(')ARE CONSERVATIVE ASSUMED VALUES 	PER GAS DESIGN STANDARD A-38,'PROCEDURES FOR PURGING GAS FAOUTIES.'
<br />      							PER TD-412SP-09 PROCEDURE FOR THE RESOLUTION OF UNKNOWN PIPELINE FEATURES(PRUPF).   3. THE PIPE SHALLRE SECTIONALIZED AT INTERVALS AS SPECIFIED IN THE RETIREMENT PLAN.
<br />     							C ALL WORK DEPICTED IN THIS DRAWING IS TO BE AS-BUILT UNDER THE PRIMARY ORDER NUMBER.      THE LOCATIONS CALLED OUT ARE APPROXIMATE AND ARE SUBJECT TO FIELD VERIFICATION TO
<br />  							7. WELDING REQUIREMENTS:    					IDENTIFY THE MOST OPTIMUM LOCATION IN THAT VICINITY,ACCURATE SURVEY DATA MAY
<br />     							A.ALL ARC WELDING IS TO BE PERFORMED IN ACCORDANCE WITH THE GAS WELDING CONTROL	NOT BE AVAILABLE FOR THESE LOCATIONS SOUSE CAUTION DURING EXCAVATION AND WHEN
<br />      							MANUAL TD4160M.REFER TO T"160P.20 OR 70-0160P-26 FOR GENERAL WELDING REQUIREMENTS.  IDENTIFYING THE PIPELINE TO BE RETIRED.OTHER ACTIVE PIPELINES MAY BE IN THE AREA.
<br />     							B.PERFORM ALL IN-SERVICE WELDING PER UTILITY PROCEDURE RD-416OP4
<br />    												0.       	4. ATEACHSUCHLOCATION NOTED ABOVE,APIECE OF PIPE AT LEAST 24'LONG SHALL BE
<br />     							C AUCANS OR SPOOLS SHALL BEA MINIMUM LENGTH OF ONE PIPE DIAMETER,WHENEVER POSSIBLE.    REMOVED.INSTALLAI'HIGH PRESSURE SAYE-A-VALVE IH-17491,M022287 TO CHECK FOR
<br />     							D.WHEN INTERNAL MISALIGNMENT ATGIRTHWELDS EXCEEDS 0.094',RACKWELD WHERE THERE IS      PRODUCT AND PRESSURE PRIOR TO CUTTING INTO THE PIPELINE.THE OPEN ENDS OF THE
<br />      							ACCESS TO THE INSIDE OF THE WELD.WHERE THERE IS NO ACCESS TO THE INSIDE OF THE WELD,      RETIRED PIPE SHALL BE SEALED By THE MOST APPROPRIATE METHOD OUTLINED IN GT&O
<br />      							MACHINE BORING OR GRINDING IS REQUIRED.RACKWELDING,GRINDING,OR BORING MUST BE      UTILITY WORK PROCEDURE TD-950TH-I6.BACKFILL APPROPRIATE
<br />      																		METHOD
<br />   																			OUTLINED
<br />    																			GHLY COMPACTED IN
<br />      							DONE IN ACCORDANCE WITH TD4I60P-2008 TDd160.26,AS APPROPRIATE.		PLACE OF THE REMOVED SECTION OF PIPE.
<br />  							e. STRENGTH TEST REQUIREMENTS      				DESIGN CHANGE PROCEDURE
<br />     							A STRENGTH TESTING SHALL MEET PRESSURE AND DURATION REQUIREMENTS OF GAS STANDARD
<br />      							A-34 AND SH ALL BE CONDUCTED IN ACCORDANCE WITH U7IUTY PROCEDURE TD41375.	MAINTENANCE AND CONSTRUCTION PERSONNEL MUST OBTAIN APPROVAL FROM THE PROJECT
<br />     							B.ALL WELDS THAT HAVE NOT BEEN STRENGTH TES TED AND ALL FITTINGS SHALL BE SOAP TESTED AT  ENGINEER(PED)BEFORE MAKING ANY DESIGN CHANGE TO GAS FACILITIES PER TD4014P-01.
<br />      							100 PSI AND AT OPERATING PRESSURE BEFORE COATING CAN OCCUR.
<br />  							9. COATING REQUIREMENTS:
<br />    	B       					A.ALL EXPOSED PIPE AND FITTINGS ARE TO BE COATED IN ACCORDANCE WITH GAS STANDARD     													B
<br />      							E-30.ALL COATING ON BURIED PIPE AND FITTINGS ARE TO BE APPLIED IN ACCORDANCE WITH
<br />      							GAS STANDARD E-35.
<br />     							B.FOR COATING SELECTIONS ON BURIED PIPE,SEE DIRECT BURIAL COATING SELECTIONS TABLE.
<br />     							C.CONTACT THE PROJECT ENGINEER(PED)TO REQUEST VARIANCE FROM THE
<br />      							APPROVED COATING PRODUCTS.
<br />  							ID INSPECTION WHENEVER EXISTING PIPELINE:
<br />     							A.CONSTRCTION,INGFOL BUROW TD GASOP-01 O D ARE ENT PIPE I DURING ENGINEERING ORO RING
<br />      													MISTING CONSTRUCTION,FOLLOW TD-5300P-01 TO DOCUMENT PIPE INSPECTION.THIS APPLIES TO E%ISTING      												&
<br />      							AND TO BE RETIRED FACILRIES,
<br />     							B.EXISTING GIRTH WELDS,AT TITIN LOCATIONS,SHALL BE IDENTIFIED AND REMOVED IF PRACTICAL     											GAS TRANSMISSION
<br />      																									ESTIMATING&DESIGN
<br />     							C.PRIOR TO TIE-IN,INSPECT COATING AND PIPE FOR DEFECTS.IF DEFECTS ARE FOUND,
<br />      							CONTACT PROJECT ENGINEER(PED)FOR GUIDANCE.    																i
<br />    	A      																									4!
<br />     									WARNING:      		"7e  								PIPELINE-CONSTRUCTION NOTES       °LLbM"II IHIi
<br />     									THB O(KUNExT CONT/�xt      8
<br />     									cDxO xnN.vnOvwETAgr  											L(2)49' D1 MP 0.93
<br />      									tmM�TpxTHATBTxE SaE    4       									INSTALL(2)49'DWA's&RERECTIFIER       nn C-1415
<br />     									PROPE OF PAUF MOI AND
<br />     									_E.IX coNJVAxr AHD i5      										STOCKTON,SAN IOAQUIN COUNTY       		'
<br />     									OTIENDEDEOR USE DNIY By     															E
<br />     									Al1INORlEFO VAUEK GAf AND       				¢SYFDEp(Ox5T4iK5px       				445 mu6N®O4A OKTY4U5Nx   	RIrtTRO i OE   SIFDS
<br />   											VR.elSt'F OBIOW.
<br />     									'MM
<br /> 										COMFANYENN0r S       		.,  		o<x�c.     	US      PACIFIC GAS AND ELECTRIC COMPANY
<br />      									DmADENTS	CanoeloTBvoudiv.      												74026770  0
<br />     										o W6F m.					REVISIONS       				SAN FRANCISCO,CALIFORNIA
<br />			1   		2   		3   		4   		5     :.I     	6   		7   		;18  		9    5       	10    �*