Laserfiche WebLink
SPEECH & HEARING CENTER <br /> 0 20 <br /> Feet <br /> (All locations are approximate, <br /> based on field measurements <br /> from known stationary features.) <br /> TP-8TP-6 TP-7 <br /> 1 <br /> Dot 00 0 0 0 0 <br /> TP-9 2B <br /> • • Q O TP- 1 <br /> TP-1 <br /> t � i <br /> t <br /> t , <br /> TP-1 t <br /> t • t <br /> t <br /> TP-14 ---- Former UST Tank Excavation <br /> TP-15 <br /> ® t Building Perimeters <br /> , t <br /> t <br /> ------ lCk Parking Lot Curb <br /> TP-5 0 Unaccessible Proposed <br /> TP-18 Groundwater Sampling <br /> • •O Locations <br /> TP-16 TP-17 <br /> • • Soil/Groundwater <br /> &4 Sample Locations <br /> TP-19Proposed Groundwater <br /> • Monitoring Well <br /> Q Handicapped Parking Signs f <br /> NEW PARKING Gel ® Light Pole <br /> LOT <br /> Estimated Groundwater <br /> Flow Direction <br /> FORMER PHYSICAL <br /> PLANT BUILDING <br /> Additional Groundwater Assessment/200252 ■ <br /> SOURCE: Environmental Science Associates,2000 <br /> Figure 4 <br /> Map Showing Recent Soil <br /> Groundwater Sampling Locations <br />