Laserfiche WebLink
.- <br /> JUL 9 2001 <br /> University Of The Pacific -3-- <br /> be proposed when necessary to mitigate an immediate demonstrated hazard.Implementing interim t <br /> remedial action does not eliminate the requirement for a CAP and an evaluation,of the most cost- r <br /> effective corrective action alternative. <br /> Three bids and Cost Preapproval: Only corrective action costs required by the regulatory agency to <br /> protect human health, safety and the environment can be claimed for reimbursement. You must comply <br /> with all regulatory agency time schedules and requirements and you must obtain three bids for any <br /> required corrective action. Unless waived in writing,you are required to obtain preapproval of costs for <br /> all future corrective action work. If you do not obtain three bids or a waiver of the three bid <br /> requirement, reimbursement is not assured and costs may be rejected as ineligible.. <br /> If you have any questions,please contact me at(916) 341-5681. <br /> L I <br /> Sincerely, <br /> ORIGINAL SIGNED OR r <br /> Sandy Gill <br /> Claims Review Unit <br /> Underground Storage Tank Cleanup Fund _ <br /> cc: Mr. Gordon Boggs <br /> RWQCB,Reg. 5 - Sacramento <br /> 3443 Routier Road <br /> Sacramento,CA 95827-3098 <br /> Ms. Margaret Lagorio <br /> San Joaquin County EHD <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> y . <br /> California En vironmental Protecdon Agency <br /> Qa RecyckedPaper <br />