Laserfiche WebLink
Lr+ <br /> ATTACHMENT A <br /> HEALTH & SAFETY PLAN <br /> 1.0 PLAN SUMMARY <br /> 1.1 Site-Location: University of the Pacific,former Physical Plant <br /> 1081 W.Mendocino Avenue <br /> Stockton, California <br /> 1.2 Personnel Responsibilities <br /> Project Manager: Peter Hudson/Jennifer Schulte <br /> Project Health and Safety Manager: Peter Hudson/Jennifer Schulte <br /> Field Health and Safety Manager: Peter Hudson/Jennifer Schulte/Crystal Stech <br /> 1.3 Description of Work: <br /> Four groundwater monitoring wells will be installed. Soil and groundwater <br /> samples will be collected. <br /> 1.4 Identified Hazards: <br /> Chemical: Low concentrations of petroleum hydrocarbon impacted soils <br /> Physical: Drill rig and equipment, hand tools, work intensive labor,fire <br /> 1.5 Monitoring_Equipment: <br /> Field Observation—The need for vapor monitoring equipment is notanticipated. <br /> 1.6 Protective Equipment Available: <br /> ' Hard Hats <br /> Steel-toed Boots <br /> Nitrile Gloves <br /> Glasses With Shatterproof Lenses <br /> Tyvek Coveralls (if needed) <br /> Air Purifying Respirators(if required) <br /> i.a I <br /> i <br /> Environmental Science Associates 1 University of rhe Pacific <br /> September 2001 Workplan For Groundwater Monitoring WeU Installation <br /> 200252 <br />