Laserfiche WebLink
_x___x__x__x__x_x__X__x_x_ <br /> O O O <br /> TP-6 TP-7 TP-8 <br /> SPEECH & HEARING <br /> CENTER <br /> O O O <br /> TP-9 TP-10 TP-11 <br /> r <br /> r TP-12 TP-4 TP-13 <br /> O O <br /> i (1300-P P-b) �t <br /> t , <br /> �? TP-1 <br /> U <br /> TP-14 TP-3 (ND) TP-2 TP-15 <br /> • O <br /> ( <br /> O D) i i (ND) <br /> i <br /> -TP-5-_% ------Former UST Tank Excavation <br /> (1.4 ppb) Building Perimeters <br /> TP-16 TP-18 <br /> O TP-17 O - - - - - <br /> -Parking Lot Curb <br /> O <br /> NEW PARKING X x Fence Line <br /> LOT <br /> Soil/Groundwater <br /> Sample Locations <br /> (July 5, 2000) <br /> Proposed Groundwater <br /> ( ; O Sampling Locations <br /> 0 20 <br /> (1300 ppb) Concentration of MTBE in <br /> Feet groundwater sample(July 5,2000) <br /> ND=not detected. <br /> ppb=parts per billion <br /> FORMER PHYSICAL <br /> PLANT BUILDING (All locations are approximate, <br /> based on field measurements <br /> from known stationary features. <br /> f Proposed soil boring locations <br /> i subject to change depending <br /> U on field conditions.) <br /> Additional Groundwater Assessment Workplan/200252 ■ <br /> SOURCE: Environmental Science Associates,2000 Figure 3 <br /> ' Map Showing Existing and Proposed Soil/Groundwater Sampling Locations <br />