Laserfiche WebLink
8 a Describe the method that will be u laze _to p a and/or Inert the tank(s) <br /> Dl 1D� oL <br /> �-p S7r, <br /> TanklPoI gHaulee = - r - _- _- -_ _ - __— _ <br /> Name '►J r C Fgc7 <br /> Address L+1 ` Zip <br /> f <br /> Phone No� t7 � <br /> ed-as hazardous _ -Z -��S '— <br /> Hauler Registration#(if haul =) <br /> c TankMping Disposal Site ' <br /> -� <br /> Name S TL� <br /> Address a G L� city <br /> Phone No <br /> EPA ID#(it transported to a permitted TO facility) <br /> 9 Is the sampling firm an independent third party from the contractor? YES N0 i 1 <br /> i <br /> 9a Describe,in dela![,haw the soli andlor water sample(s)beneath the tank and pipLing v411be obtains <br /> 10 Describe bow the excavation will be backfilled with suitable material upon removal <br /> �4 ' <br /> 11 Handling of excavated soil - <br /> a)What material will be used to line the tank pit and cover the stockpile? , <br /> b) <br /> What*iU be itis final destination of the excavated stockpile?� to R / —Tt <br /> I <br /> F <br /> c ntaminated Soil Hazardous WasteHauler <br /> NameNKA T Hauler Registration <br /> 4L1N'� City r%L nyl Zip 1 <br /> Address 3316 <br /> Phone No <br /> 7 <br /> ER 23 046(Revised 48113199) Page 5 - - - - <br />