My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MILGEO
>
850
>
3500 - Local Oversight Program
>
PR0545550
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2020 11:29:53 PM
Creation date
3/16/2020 4:42:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545550
PE
3528
FACILITY_ID
FA0003973
FACILITY_NAME
SHOCKEY & SONS TRUCKING
STREET_NUMBER
850
STREET_NAME
MILGEO
STREET_TYPE
RD
City
RIPON
Zip
95366
CURRENT_STATUS
02
SITE_LOCATION
850 MILGEO RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ACCESS AGREEMENT <br /> Ground Water.Monitoring Well Installation <br /> APN: 261-080-23, Ripon, CA. <br /> As the property owner,I(MGR LLC)do hereby grant permission toAdvanced GeoEnvironmental, <br /> Inc. (AGE) to install one ground water monitoring well at APN 261-080-23 in Ripon, CA. The <br /> investigation is being performed under the directive of the San Joaquin County Environmental <br /> Health Department(EHD). <br /> The scope of work will include advancing (drilling) an 8-inch diameter pilot borehole to an <br /> approximate depth of 35 feet below site grade (bsg) to collect soil samples and install one ground <br /> water monitoring well for the collection of quarterly ground water samples at one location on the <br /> APN 261-080-23 property, utilizing a hollow stem auger drill rig. A one week notification will be <br /> given to MGR LLC prior to performance of any field operations. <br /> Boring and well installation activities will completed in approximately 1 day, however; quarterly <br /> ground water monitoring may require 2 to 5 years of sampling.The area utilized for well installation <br /> at APN 261-080-23,Ripon, CA shall be returned to its original condition; the well will be properly <br /> destroyed and sealed under EHD oversight upon attainment of site closure. <br /> All costs for performance of the subsurface investigation will be the sole responsibility of Shockey <br /> and Sons Trucking located at 850 Milgeo Avenue,contact person is Mr.Lee Shockey. The Shockey <br /> Trucking will be solely responsible for all costs and expenses for investigation associated with any <br /> contamination from the Shockey and Sons Trucking site. <br /> Copies of all testing and reporting for any investigation performed at 850 Milgeo Avenue will be <br /> forwarded to MGR LLC. Furthermore,MGR LLC will be provided with a copy of the"No Further <br /> Action" letter from the appropriate regulatory agencies upon completion of investigation, if <br /> requested. <br /> MGR LLC Date <br /> Mr. Randy Eskes, Representative <br /> 775 Frontage Road <br /> Ripon, California <br />
The URL can be used to link to this page
Your browser does not support the video tag.