My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MILGEO
>
850
>
3500 - Local Oversight Program
>
PR0545550
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2020 11:29:53 PM
Creation date
3/16/2020 4:42:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545550
PE
3528
FACILITY_ID
FA0003973
FACILITY_NAME
SHOCKEY & SONS TRUCKING
STREET_NUMBER
850
STREET_NAME
MILGEO
STREET_TYPE
RD
City
RIPON
Zip
95366
CURRENT_STATUS
02
SITE_LOCATION
850 MILGEO RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Aou�N Environmental Health Department DIRECTOR <br /> Donna Heran,REHS <br /> z z 1868 East Hazelton Avenue <br /> :{ Stockton, California 95205-6232 PROGRAM COORDINATORSRobert McClellon,REHS <br /> ' Jeff Carruesco,REHS,RDI <br /> �'q •.,•,• �P Website:www.sJgov.org/ehd Kasey Foley,REHS <br /> Phone: (209)468-3420 Linda Turkatte,REHS, <br /> Fax: (209)464-0138 <br /> WALTER L. & LENNA SCHOCKEY TR <br /> c/o LEROY SHOCKEY <br /> 205 PEDRAS ROAD <br /> TURLOCK, CA 95382 <br /> s <br /> RE: SHOCKEY TRUCKING LOP Site Code: 2581 <br /> 850 MILGEO <br /> RIPON, CA 95366 <br /> WORK PLAN: Well Destruction <br /> DATED: February 25, 2013 <br /> PREPARED BY-,Advanced GeoEnvironmental (AGE) <br /> IN <br /> DISAPPROVED: [ ] <br /> ADDENDUM NEEDED: [ ] Submit by: <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25296.10 (c)(3)]: <br /> 1. To properly destroy all on-site and all off-site wells associated with the site investigation and <br /> remediation testing. <br /> 2. To over-bore wells in contaminated areas and pressure grout wells in non-coritaminated areas. <br /> 3. To handle all waste generated during destruction activities appropriately. <br /> 4. To provide the EHD with receipts and/or manifests documenting the final disposition of waste in a <br /> well destruction report. <br /> COMMENTS AND CONDITIONS: <br /> 1. To apply for Well Destruction Permits for each parcel where wells are located within 30 days of <br /> receipt of this work plan approval. <br /> 2. To obtain and include access agreements with permit applications for all properties where wells <br /> are located. <br /> 3. To submit a well destruction report to the EHD and the CVRWQCB within 60 days of completion <br /> of the scope of work. The report must also be uploaded to GeoTracker for review and receipt by <br /> the EHD. <br /> DATED BY <br /> Harlin Knoll Senior REHS 209 468-3442 <br /> CC: Brian W. Millman, AGE, 837 Shaw Road, Stockton, CA 95215 <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.