Laserfiche WebLink
Message Page 1 of 2 <br /> NW <br /> Margaret Lagorio [EH] <br /> From: Art Deicke [adeicke@advgeoenv.com] <br /> Sent: Thursday, July 05, 2007 10:16 AM <br /> To: Margaret Lagorio [EH] <br /> Cc: Harlin Knoll [EH]; 'Sob Marty'; 'Bill Little' <br /> Subject: RE: SHOCKEY TRUCKING Site in Ripon <br /> Ms. Lagorio, <br /> This is a status report on the Additional Site Assessment Work Plan Addendum for Shockey <br /> Trucking which is due to EHD on 7-6-2007. <br /> - EHD has recommended a shallow ground water monitoring well east of the site in the area of the <br /> AGE-proposed soil boring B-22. This area is in the CALTRANS right of way. Initial discussions (I <br /> visited the District 10 office prior to submitting the work plan) with CALTRANS indicate a boring <br /> encroachment permit will be relatively easy to obtain,possibly within 1 to 2 days, however; a <br /> monitoring well encroachment permit may take I to 2 months and may not be approved. AGE applied <br /> for a performance bond for the monitoring well in CALTRANS ROW as the first step in attaining an <br /> encroachment permit. The performance bond is in process. <br /> - EHD has recommended a shallow ground water monitoring well northwest of well MW-1, between <br /> AGE-proposed borings B-20 and B-21. This area belongs to MGR LLC and is currently a large <br /> undeveloped vacant lot. Future use is undetermined at this time. H &W Construction,business operator <br /> at adjacent site and a.k.a. MGR LLC was agreeable to advancing borings, but hesitant to install <br /> monitoring wells. We will need to meet with MGR LLC again and discuss a monitoring well <br /> installation. MGR LLC has refused access for a ground water monitoring well. They will allow soil <br /> borings, but not monitoring wells. EHD requested a written response from MGR.LLC which was <br /> provided to EHD on 07 June 2007. As of 06 July 2007, EHD continues to work on the issue of access at <br /> MGR LLC. <br /> - AGE proposed wells MW-6, MW-7, MW-8 and MW-9 are located in City of Ripon right of way and <br /> will require encroachment permits. I have discussed these well locations with the City of Ripon <br /> Engineering department and was given tenative approval, however; encroachment permits require <br /> processing time. AGE has not applied for the City of Ripon encroachment permits <br /> yet pending the determination.of the scope (well or boring) on the MGR LLC property. <br /> - Additionally, bids from well drilling companies have not been requested due to the pending and now <br /> received EHD comment letter. Once encroachment permitting (City of Ripon and CALTRANS) and <br /> access agreement (MGR LLC) have been obtained, drill bids will be requested. Drill bids are <br /> pending determination of scope of the work (well or borings) on the MGR LLC property is <br /> determined. <br /> Best Regards, <br /> Arthur Deicke <br /> Project Scientist <br /> Cell: (831)402-5860 <br /> adcicke_�t{act_v_ eg oenv.conl <br /> 7/5/2007 <br />