My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MILGEO
>
850
>
3500 - Local Oversight Program
>
PR0545550
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2020 7:43:52 PM
Creation date
3/16/2020 4:43:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545550
PE
3528
FACILITY_ID
FA0003973
FACILITY_NAME
SHOCKEY & SONS TRUCKING
STREET_NUMBER
850
STREET_NAME
MILGEO
STREET_TYPE
RD
City
RIPON
Zip
95366
CURRENT_STATUS
02
SITE_LOCATION
850 MILGEO RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06 March 2007' = 4 Y 4 <br /> AGE-NC Project N6.:95-;O185 T <br /> Page 9 of 9 r ; <br /> 94-pound sack of cemeriUT-he grout-vii11 be.p'laced'by pumping through tremrriie-pipe The EHD will . <br /> ' be no_tifred for grout inspection at least".72 hours prior_to conductmg�grouting procedures'a, <br /> :3.6. WELL DEVELOPMENT.AND SURVEY <br /> Development will consist of a combination of bailing to remove theinajor-portion of fine-grained- <br /> sediment from inside the"'Well, surging to flush but`or•draw in'sediment from the filter pack; and <br /> .additional bailing to.finish the removal of sediment Developmentactivlties will.be-continued until" ._> <br /> ' = field arameter H electrieal coriductivi and.tem eratuie) readm s-have-stabilized:.Additionall - <br /> P {P. '7. p ) g Y� <br /> '.'each wellhead elevation and GPS location coordihate-,will be-surveyed_.by a'licensed surveyor. <br /> 3.7. EQUIPMENT DECONTAMINATION ,, f s <br /> All sampling tools used for sample collection will be thoroughly rinsed with an water:after being <br /> washed with a solution of Alconok:All down=hole.drill ing,equipment will.be washed.prior to _ <br /> starting each boring:Ririseate generated during•dr.:liog and ground water`sampling activities will '` s <br /> - be containerized iri properly,labeledDOT-approved`55=gallon druins,:.and stored on-site.in an;area , <br /> �- lacking public access. Disposal alter`native's will.be evaluated based'on"result s of soil and water <br />` analysis- " ` - '. ' , t <br /> z�E ti <br /> F T4. <br /> ; <br /> Advanced GeoEnviHnmental,Ine <br />
The URL can be used to link to this page
Your browser does not support the video tag.