Laserfiche WebLink
1 <br /> 1 <br /> • 20 1 August 2002 <br /> AGE-NC Project No. 95-0185 <br /> Page 4 of 4 <br /> ' 5.0. RECOMMENDATIONS <br /> S <br /> ' Based upon the results of the second quarter 2002 monitoring event, AGE recommends. <br /> Y Continued quarterly ground water monitoring at the site, for dissolved TPH-d. <br /> ' Y Implementation of an ozone air-sparging pilot test at the site to evaluate and potentially <br /> mitigate the dissolved TPH-d in the former UST area. <br /> 6.0. LIMITATIONS <br /> ' Ourrofessional services were ere performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities.The findings were based on analytical <br /> results provided by an independent laboratory.Evaluations ofthe hydrogeologic conditions at the site <br /> for the purpose of this investigation were made from a limited number of available data points (i.e. <br /> lieground water samples) and subsurface conditions may vary away from these data points. No other <br /> warranty, expressed or implied, is made as to the professional interpretations, opinions and <br /> recommendations contained in this report. <br /> 1 <br /> Advanced GeoEnvironniental,Inc. <br />