Laserfiche WebLink
J <br /> TABLE 1 <br /> RELATIVE GROUND WATER ELEVATIONS <br /> Shockey And Sons Trucking <br /> 580 Milgeo Avenue, Ripon, California <br /> (Feet) <br /> Well.No. Casing Depth to'Ground Ground Water <br /> Date <br /> Well screen), Elevaison Water ETevahon <br /> MW-1 60.13 06-24-96 20.13 40.00 <br /> (14-34 feet bsg) 09-24-96 21.58 38.55 <br /> 12-05-96 21.43 38.70 <br /> 03-27-97 17.93 42.20 <br /> 06-06-97 17.73 42.40 <br /> 10-31-97 21.16 38.97 <br /> 01-23-98 21.20 38.93 <br /> ' 04-07-98. 17.10 43.03 <br /> 06-11-98 16.46 43.67 <br /> 03-25-99 17.70 42.43 <br /> 06-25-99 18.35 41.78 <br /> MW-2 59.84 06-24-96 20.05 39.79 <br /> (12-32 feet bsg) 09-24-96 21.28 38.56 <br /> 12-05-96 21.14 38.70 <br /> 03-27-97 17.64 42.20 <br />' 06-06-97 17.45 42.39 <br /> 10-31-97 20.89 38.95 <br /> 01-2398 20.93 38.91 <br />' 04-07-98 16.84 43.00 <br /> 06-11-98 16.20 43.64 <br /> 12-01-98 17.90 41.94 <br />' 03-25-99 17.45 42.39 <br /> 06-25-99 18.14 41.70 <br /> MW-3 60.51 06-24-96 20.67 39.84 <br /> (12-32 feet bsg) 09-24-96 21.96 38.55 <br /> 12-05-96 21.82 38.69 <br />' 03-27-97 18.34 42.17 <br /> 06-06-97 18.10 42.41 <br /> 10-31-97 21.54 3897 <br /> 01-23-98 __. _ r _.20..93. _. �- 39.58 <br /> 04-07-98 17.48 43.03 - <br /> 06-11-98 16.83 43.68 <br />' 12-01-98 17.76 42.75 <br /> . 03-25-99 18.10 42.41 <br /> 06-25-99 18.75 41.76 <br />