My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MELLON
>
800
>
2800 - Aboveground Petroleum Storage Program
>
PR0515468
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2020 12:01:57 PM
Creation date
3/17/2020 11:59:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0515468
PE
2832
FACILITY_ID
FA0003691
FACILITY_NAME
MBM, Manteca
STREET_NUMBER
800
STREET_NAME
MELLON
STREET_TYPE
AVE
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
800 MELLON AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
McLane Company— Manteca, CA <br /> Periodic Testine of the Inteivity of Above round Tanks <br /> 40 CFR 11 2.8(c)(6) <br /> The systems are inspected monthly for leaks, stains and spills of#2 Diesel as required by <br /> the SPCC Plan and CFR 40 112.7. Steel Tank Institute's SP001 Standards testing was perfonned <br /> by a Certified SP001 Inspector II on April 16, 2019. Next test will occur in 2039, by a Certified <br /> SP001 Inspector. Inspections of the site are performed by trained staff and done to Industry <br /> Standards. The monthly inspections are recorded on page 33. <br /> Lea kaze from Internal Heatin11 Coils <br /> 40 CFR 112.8(c)(7) <br /> There are no internal heating coils within this system. The applicable requirements of 40 <br /> CFR 112.8(c)(7) do not apply to this facility or SPCC Plan. <br /> Enp-ineer or Update Containers to Avoid Discharze 40 CFR 112.8(c)(8) <br /> McLane Company uses a visual tank gauge system consisting of a tank gauge that indicates <br /> the tank's volume in feet and inches. When the driver arrives on site and prior to unloading any <br /> oil product, they will verify tank space and insure that the oil product to be delivered will fit. The <br /> #2 Diesel fuel storage tanks are equipped with a monitoring port system. If the driver is alerted of <br /> danger or overfill during delivery,the driver will cease all loading and secure the system. <br /> Observe Effluent Discharge, 40 CFR 112.8(c)(9,) <br /> McLane Company does not employ a surface water effluent or water separation treatment <br /> system at this site, The requirements in 40 CRR 112.8(c)(9) are not applicable. <br /> P,•omudy Address Visible Discharge 40 CFR 112.8(c)(10) <br /> This is addressed within this Plan at 40 CFR 112.7(e). <br /> Mobile or Portable oil Storage Containers 40 ('.FR 112.8(c)(11) <br /> McLane Company has mobile and/or portable oil storage containers within their oil product <br /> management system. A 150 Gallon #2 Diesel fuel tank located on a trailer near the shop on <br /> concrete. <br /> Facility Transfer Operations 40 CFR 112.8(d)(1),(2),(3),(4), & (5) <br /> These items are addressed in 40 CFR 112.7(a)(3)(iii). <br /> 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.