My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005360
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
647
>
3500 - Local Oversight Program
>
PR0545553
>
ARCHIVED REPORTS_XR0005360
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 1:10:24 AM
Creation date
3/17/2020 2:22:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005360
RECORD_ID
PR0545553
PE
3528
FACILITY_ID
FA0006207
FACILITY_NAME
VALLEY VOLKSWAGEN
STREET_NUMBER
647
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
647 E MINER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Ms. Dot Lofstrom <br /> Page 4 of 5 <br /> 3.2 Well Development,Surveying and Groundwater Sampling <br /> Thelevation of the casingcollar of the new well will be surveyed to an accuracy of 0.01 feet and <br /> e <br /> Y Y <br /> tied into the casing elevation of existing well MW 1. A minimum of 48 hrs after well completion, an <br /> experienced field technician will measure static depth to water and then develop the well by <br /> pumping and surging until turbidity is minimized. A minimum of three casing volumes will be <br /> purged from the well. <br /> Subsequent to well development, groundwater samples will be collected from the well after pH, <br /> temperature, and electrical conductivity have stabilized and the water level in the well has recharged <br /> to at least 84% of the static level. Water samples will be placed in appropriate containers, labeled <br /> and placed in an ice chest at a temperature of 4 degrees Centigrade for shipment to the laboratory <br /> under chain of custody protocol. Analysis will consist of TPHg, BTT-X, gasoline oxygenate <br /> additives,DCA and EDB. <br /> 3.3 Reporting <br /> Following the receipt of analytical results, a technical report describing the methods and results of <br /> well installation and sampling will be submitted to PHS/EHD and RWQCB. <br /> The report will contain recommendations for additional investigation or sampling or may <br /> recommend case closure as appropriate. <br /> 3.4 Protocols and Safety <br /> All field activities performed at the site will be conducted in accordance with the Quality <br /> Assurance/Quality Control Plan and Site Specific Health and Safety Plan included as Attachments <br /> A and B, respectively. <br /> Drill cuttings will be placed on and covered with plastic sheeting or will be drummed. Water <br /> generated from well purging and equipment decontamination will be contained in labeled DOT <br /> approved drums. The drums will be stored on site pending laboratory results and the development <br /> of disposal options. <br /> 3.5 Permitting and Schedule <br /> A County well construction permit application, a City of Stockton encroachment permit application <br /> and associated fees will be submitted following approval of this workplan. Following receipt of the <br /> permits, fieldwork will be scheduled <br /> vaIIeyvwlreportslwkpinmw2.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.