Laserfiche WebLink
CVV2/0 <br /> . A S S O C I A T E S I N C <br /> measured in MW3, more than 90 feet east of VE-1 Concentrations of TPHg in the extracted <br /> vapors ranged from 35,000 ug/L to 56,000 ug/L <br /> ' Convertin these values to arts per million volume (ppmv), concentrations ranged from 9,800 <br /> Converting P P PP g <br /> ppmv (at 6 hours) to 15,680 ppmv (at 12 hours) Generally, a vacuum of 0 10 is required to <br /> ' successfully volatilize subsurface hydrocarbons The effective radius of influence at the site <br /> was estimated to be approximately 37 feet <br /> ' Dissolved oxygen and groundwater depth data collected during the pilot study indicated that <br /> IAS, combined with SVE should provide a viable alternative for remediation of impacted <br /> ' groundwater at the site <br /> Dissolved oxygen in groundwater was measured in the IAS observation wells at several <br /> ' intervals throughout the IAS test In ASO-1, dissolved oxygen ranged from 84 1% to 87 4%, <br /> in ASO-2, dissolved oxygen ranged from 16 0% to 32 9%, dissolved oxygen was measured at <br /> 62 4% in ASO-3 It appears that the effective radius of influence for the air sparging wells on <br /> ' site may be as great as 20 to 30 feet <br /> Based on the results of the pilot testing, GAS concluded in their Final Remediation Plan that <br /> Mthe cleanup time for remediating the site would be approximately 2 years <br /> Remediation Well Installation <br /> ' On April 19, 1997, AGE installed one additional SVE well, VW-7 at the eastern edge of the <br /> site to a depth of 15 feet Also six IAS points were installed using two 21-inch long, 318-inch <br /> t I D stainless steel screen implants attached to an anchor tip at 30 feet bgs IAS-2 through <br /> IAS-7 were installed to depths of 30 feet bgs Vinyl tubing (318-inch O D ) was extended <br /> from the spargmg screen implant to the surface and a filter pack (fine glass beads) was <br /> ' installed around the screen implant from a depth of 25 to 30 feet bgs Bentonite sand (#8 <br /> bentonite) was used to make a 4-foot plug above the filter pack and the wells were grouted to <br /> ' surface grade with Portland cement <br /> Soil Vapor_Extraction_System Installation <br /> ' On March 4, 1997, a King, BucklHasstech (KBH) (90-032) catalytic oxidation unit (SVE unit) <br /> was delivered to the site The extraction equipment was placed inside a fenced enclosure near <br /> ' the west end of the site On April 1, 1997, the natural gas service to the SVE unit an the site <br /> was upgraded to 5 pounds of pressure per square inch, the minimum pressure required to <br /> operate the KBH catalytic oxidation system <br /> ' The existing network at the site consisted of subsurface flex piping from wells VE-2, VE-5, <br /> VE-6 and MW4 to the remediation unit enclosure AGE installed additional subsurface piping <br /> from wells VE-1, VW-I and VW-7 The piping was then routed through a moisture knockout <br /> w 1271421reportslclosore doc 7 <br />