Laserfiche WebLink
1.1 <br /> pg/1, 97 pg/l and 15,000 µg/l, respectively Benzene was not detected in wells MW-2, MW-5 and <br /> MW-6 Other BTEX compounds were detected In these wells at concentrations as high as 18,000 <br /> ltg/l (toluene, MW-4) Ethylbenzene and xylenes were detected in MW-3 at concentrations of 230 <br /> Ag/l for each compound No petroleum hydrocarbons were detected in the samples collected from <br /> wells MW-2 and MW-b, the newly installed down-gradient well <br /> MONITORING WELL INSTALLATION <br /> On 01 April 1998, soil boring MW-7 was advanced on the property directly east of the site The <br /> boring location is illustrated on Figure 2 The soil boring was advanced to a depth of 25 feet bsg <br /> Boring MW-7 was completed as a ground water monitoring well The well was completed using 2- <br /> inch diameter schedule 40 PVC casing with 0 02-Inch slotted screen from approximately 5 to 25 feet <br /> bsg A filter pack was installed using#2 Lonestar sand from 4 to 25 feet Bentonite chips were used <br /> to make a two-foot plug and the remaining annular space was backfilled to the surface with portland <br /> cement A traffic-rated well box (8-inch diameter)was installed over each well, in accordance with <br /> County regulations <br /> Samples were collected at five-foot intervals,with samples were preserved by covering both ends of <br /> the brass sleeve with Teflon sheets,capping and sealing with tape TPH-g,BTE&X and oxygenated <br /> compounds were not detected in soil samples collected from the location of well MW-7 Soil samples <br /> collected from depths of 15, 20 and 25 feet bsg were analyzed <br /> REMEDIATION WELL INSTALLATION <br /> On 29 July 1997, three in-situ air-sparing (lAS) points (IAS-7 through IAS-9) were installed to <br /> depths of 25 and 15 feet bsg using AGE's van-mounted Geoprobe 5400 soil probing machine Two <br /> probe bonngs were completed as IAS points using one 21-inch long, 318-inch I D stainless steel <br /> screen implant attached at 25 feet bsg to an anchor tip One additional probe boring was completed <br /> using one 21-inch long,318-inch I D stainless steel screen implant set at a depth of 15 feetbsg Vinyl <br /> tubing(3/8-inch O D )was extended from the sparging screen implant to the surface and a filterpack <br /> (fine glass beads)was installed around the screen implant from a depth of 20 to 25 feet bsg Bentonite <br /> sand (#8 bentonite)was used to make a 4-foot plug above the filter pack and the wells were grouted <br /> to surface grade with portland cement An eight-inch traffic box was installed at the surface for each <br /> IAS point <br /> SOIL VAPOR EXTRACTION - MASS OF RECOVERY <br /> Between 15 April and 19 September 2003, the ground water extraction and treatment system <br /> processed approximately 302,703 gallons of water The total volume of ground water treated as of <br /> 30 September 2003 Is approximately 2,459,705 gallons <br /> Advanced GeoEnvironmental,rine <br />