My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0005011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2020 12:35:50 AM
Creation date
3/17/2020 2:52:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005011
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> I <br /> MW-2 <br /> � I <br /> i <br /> Mw-6- <br /> TE D�ABLO AVENUE <br /> � Moi <br /> 511) A <br /> VE-5 <br /> CHP7 VE-6 MW-1 0CB1 <br /> ASO-Ir <br /> ® l 1 <br /> CHAS Ivw <br /> USTs AS-1 USTs 1 <br /> VE-3-4 <br /> MW-7 <br /> ` W-4 <br /> B11/WP6 E 3 y �_— +C 2 <br /> . CB50 0 <br /> MW-3 V-2 VE–L VW-7 <br /> CSS �- <br /> C� B13/WPB <br /> CB4/CHP4 y <br /> � � I <br /> ;J1 I <br /> CHP2ay EW-2 <br /> yam, <br /> BG/WPI <br /> Don <br /> B12/WP7 <br /> REMEDAT10N ENCLOSURE 0 <br /> CHP5C CHPB <br /> MW-5 <br /> CHP5 <br /> EW-1 <br /> 0 <br /> B7 CliP1 <br /> O CB3 <br /> BIO/WP5 CHP9• <br /> • <br /> CHP3 B9/WP4 . <br /> r <br /> BB/WP3 <br /> LEGEND <br /> ® BUILDING <br /> MW-1 * MONITORING/EXTRACTION WELL LOCATION <br /> ASO-1 -3�LAIR_SP_ARGING-OESERV.ATION WELL <br /> IAS-1 AIR SPARGING INJECTION WELL <br /> VW-1 VAPOR EXTRACTION WELL <br /> VE-3 VAPOR EXTRACTION & AIR SPARGING OBSERVATION WELL <br /> ASO-2 <br /> B8/WP3 SOIL BORING <br /> CB1 O CONFORMATION SOIL BORING <br /> CHP1 i CONFORMATION HYDRO PUNCH BORING <br /> - _ PROPOSED CONFORMATION BORING TRACE <br /> N <br /> SCALE <br /> 30 60 SITE PLAN 4dvanoed <br /> SET CHAPIN BROTHERS INVESTMENTS GeoEnvironmental, Inc <br /> of Kor[6ern �I/lfQr01I <br /> 1766 MO�TNr{TE DIABLO AVENUE PROJECT NO 95—i63 =MAC' <br /> ST0CI1! 0N, CALIFORNIA DATE 24 OCTOBER 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.