My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0005012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2020 12:47:48 AM
Creation date
3/17/2020 2:53:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005012
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> f <br /> ' 31 October 2003 <br /> AGE-NC Project No 95-0103 <br /> Page 3 of 7 <br /> 2 3 QUARTERLY GROUND WATER MONITORING AND SAMPLING <br /> On 01 August 2003, ground water monitoring and sampling were performed on monitoring wells <br /> ' MW-1 through MW-6 at the request of the EHD <br /> 2 3 1 Well Monitoring and Evacuation <br /> A Solinst water level meter was used to measure the depth to ground water in monitoring wells <br /> MW-1 through MW-6 relative to the tops of the well casings(Table 1) The ground water elevation <br /> in each well was calculated by subtracting the measured depth to ground water from the surveyed <br /> ' casing elevation <br /> After water levels were measured,ground water(a mimmum ofthree casing water-volumes per well) <br /> were evacuated(purged)from wells MW-1,MW-2 MW-3,MW-4,MW-5 and MW-6 Well MW-1 <br /> was purged of 27 50 gallons utilizing a waterra lift-bailer Wells MW-2,MW-3,MW-4,MW-5 and <br /> MW-6 were purged of 9 75, 7 25, 9 0, 4 0 and 7 5 gallons of water, respectively, utilizing <br /> !� polyethylene disposable bailers <br /> Temperature,pH and conductivity were measured for stabilization at regular purge-volume intervals <br /> ' from each well using an Oakton water analyzer,the field measurements are included in Appendix A <br /> Purged water was subsequently treated through the on-site ground water treatment system <br /> ' 2 3 2 Ground Water Sample Collection and Analysis <br /> ' Water samples were retrieved from each purged well using the dedicated disposable bailers after <br /> allowing the well to aclneve a minimum of 80 percent recharge prior to sample collection The <br /> samples were transferred into 40-m1 EPA-approved VOA vials containing 0 5 ml of 18% <br /> ' hydrochloric acid as a sample preservative The samples were properly labeled and transported in <br /> a chilled container under chain-of-custody to MAI a DHS-certified laboratory, for analysis The <br /> ground water samples were analyzed for <br /> ' • TPH-g m accordance h EPA Method 8415 Modified and <br /> • BTEX and MTBE in accordance with EPA Method 8260 <br /> ' 3.0. FINDINGS <br /> ' From field data collected at the groundwater treatment system between 15 Apn1 and 19 August 2003 <br /> Advanced GeuEnvlronmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.