Laserfiche WebLink
' 17 January 2005 <br /> AGE-NC Project No 95-0103 <br /> Page 9 of 9 <br /> • Continue operation and maintenance of the ground water extraction and treatment system as <br /> directed by the EHD However, continued operation of the ground water extraction system, <br /> may be beneficial, but with low dissolved contaminant recovery expected The recovery <br /> could be below the proposed definition of diminishing returns, submitted and approved by <br /> the EHD prior to the initiation of the ground water extraction process <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation ofthe hydrogeologic conditions <br /> at the site for the purpose of this investigation have been made from review of reports prepared by <br /> previous consultants and AGE, and a limited number of available data points (e g , ground water <br /> samples from monitoring and recovery wells) Subsurface conditions may vary away from these data <br /> points No other warranty, expressed or implied, is made as to the professional interpretations, <br /> opinions and recommendations contained in this report <br /> ' Advanced GcoEnvironmental,Inc <br />