4.2 Proposed Vapor Extraction System (VES) <br /> GeoAudit will install an internal combustion (IC) unit at the site The specific IC unit will <br /> be chosen by representatives of Chapin Bros , Inc As indicated by the vapor extraction <br /> test, soil conditions at the site are conducive to rapid removal of high concentrations of <br /> ' petroleum hydrocarbons by this type of system <br /> GeoAudit proposes to extract vapors from both VE-1 and VE-2 Both wells can be easily <br /> ' piped and fitted to the VES By utilizing VE-2 as an extraction well, 'Ae hope to remove <br /> hydrocarbon vapors from impacted soil within the immediate area beneath Buena Vista <br /> Avenue and, eventually, from the area near NIW-3 <br /> 4.3 Permitting <br /> Permitting will be necessary for any permanent or semi-permanent SVE unit It is our <br /> understanding that RSI maintains operational permits on the SAVE system However, <br /> GeoAudit also maintains a vaiious locations permit for the VACLEEN 1000, an IC-engine <br /> based SVE unit The VACLEEN permit was obtained in 1991 from the San Joaquin Valley <br /> Unified Air Pollution Contiol District (SJVUAPCD) Infoimation on the VACLEEN is <br /> included in Appendix I <br /> 4.4 System Location and Design <br /> MThe SVE will be located on the west side of the propeity in a recessed area along the <br /> western wall of the building A natuial gas meter is located in this area, and access space <br /> will have to be made for P G & E Althougli this is the piefeiied location, local permitting <br /> Wray not allow the installation of the unit in this are because of the gas meter Therefore <br /> an alternate location for the unit would be inside a gate, along the east wail of the building <br /> The piefeiied location will iequne a minimum of piping to connect VE-1 and VE-2 and, <br /> if desired at a later date, VW-1 The alteinate location along the east wall of the building <br /> will require more piping and trenching At either location, the unit should be fenced inside <br /> ' a gated, locked enclosure <br /> Two-inch PVC piping will be installed from VE-1 and VE-2 to the SVE unit dropout drum <br /> The piping will carry hydrocarbon vapors from the well heads to the SVE unit A PVC ball <br /> valve will be installed in each line so vapors can be dia%-Nn from each «ell independently, if <br /> ' necessary <br /> All PVCwill be installed below ground surface, in a shallow trench to the fenced enclosure <br /> ' From the enclosure to the diop-out dium, the line will be installed above-ground A plan <br /> of the proposed piping and VES unit location is illustrated in Figure 5 <br /> 1 <br /> G-1-8-1 A.3.1 Se,".». Inc 10 <br /> CHAPI N FRPI3 9LSC 94 I^»� <br />