My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005143
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0005143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2020 11:47:55 PM
Creation date
3/17/2020 2:57:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005143
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
clean-up will require approximately 24 montlis Impacted giound,�aler concentlation should <br /> show significant reductions N;%itlim G montlis <br /> ' An initial time scliedule is as follom s (upoli authorization to proceed) <br /> ' s 0 - 30 days Installation of sNstem including piping, sparging NNell and <br /> placement of SVE unit <br /> • 30 - 45 days Start-up procedures stabilization of SVE unit Lnit sliould <br /> ' operate 24-hours by da\ 45 <br /> • 45 - 210 days Initial evaluation period Vapor samples collected dL11111 this <br /> period mill determine wait efticiency <br /> 0 210 - 235 dais Dialling of inilinl progress soil bomio(s) At least one soil <br /> boi ing \\ill be di filled to obtain soil samples After analytical <br /> results lia,,e been ieceiNed fiom the labolatoi3% an e%altialion of <br /> ' the piogiess of the SVE unit Neill be made <br /> 0 235 - 720 days Unit \%ill continue operation sa111plina V-111 folio.\ similar <br /> ' schedule as abo\e <br /> Results of SVE piogiess \Hill be iepoited in Quaiteil\ Reports Based upon the iesults of <br /> ' the initial ploaiess borings an e\aluation of the S1 E pic)ject \Hill be determined \trtli a <br /> modified clean-up schedule if necessary <br /> G 0 LINII T 1 TIONS <br /> ' Our professional services N;ere peifoinled using that deawe of caie and skill oidinairk <br /> exercised by environmental consultants practicing in this o1 sinirlai localities The findings <br /> were based upon anal tical results pio%ided by an independent laboratory ENaluatlons of <br /> ' the geologiclliydiogeologic conditions at the site for the puipose of this imeltigatiori aie <br /> made from a limited number of available data points and subsuiface conditions ni,l1 .a1-\ <br /> away from these data points No other \\arrarlty expressed of Implied is nude as to the <br /> ' professional ieconimendations contained in this report <br /> 1 a,ai n.d,9— 12 15 <br /> cjjQjN[RPh 95/Sc%12 105602 <br />
The URL can be used to link to this page
Your browser does not support the video tag.