Laserfiche WebLink
i <br /> 28 April 1998 - - <br /> "' AGE-NC-95-0103 <br /> ' Page 2 of 9 <br /> { w <br /> 1 <br /> well Purged water was stored in 55-gallon drums on property Field measurements of the ground <br /> water purging parameters are included tlni Appendix A <br /> t2 2 GROUND WATER SAMPLE COLLECTION <br /> ' Water samples were retrieved from each purged well using new disposable bailers The samples <br /> were transferred into 40-m1 EPA-approved VOA vials containing 0 5 ml of 18% hydrochloric acid <br /> as a preservative and were transported in a chilled container under chain-of-custody to McCainpbell <br /> ' Analytical, Inc (MAI), in Pacheco, California, for laboratory analysis <br /> Samples were analyzed for total petroleum hydrocarbons quantified as gasoline (TPH-g), volatile <br /> ' aromatic compounds (benzene,toluene,ethyl-benzene and total xylenes BTE&X) and methyl-tert- <br /> butyl ether(MTBE) and the oxygenating fuel additives tertiary butyl alcohol (TBA), di-isopropyl <br /> ' ether (DIPE), ethyl tertiary butyl ether (ETBE) and tertiary amyl methyl ether (TAME) in <br /> accordance with EPA methods 80151n and 8020 and 8260m <br /> 23 SPARGING/EXTRACTION SYSTEM OPERATION AND MONITORING , f' <br /> ' The IAS system operated continually ddnng the quarter The sparging flow rate was adjusted to <br /> approximately 10 scfin or to"a minimum,pressure of 15 psi During each molutonng event,the depth <br /> to ground water and per cent dissolved oxygen were measured for each monitoring well (Table 3) <br /> ' General system maintenance and'adjustments were performed to January and March 1998 <br /> `f f Due to low performance the SVE unit a one-month hiatus was conducted from 15 December 1997 <br /> to 15'January 1998 The one-month hiatus was used to consult with Mr-Chapin and representatives , <br /> of the San Joaquin County Health Department, to'consider reconfiguring the system, and to check ' <br /> for a'rebound effect on extracted soil gas vapor concentrations At the time of the temporary-shut- <br /> dovnl,and^until the end of March the'SVE collection system extracted vapor from all six extraction <br /> wells on the site Since 31 March 1998, vapor has been extracted only from,VW-1°and VE-1 <br /> S <br /> The,flow rate,{of extracted vapor was measured using a Dwyer differential pressure flow meter <br /> ` Organlcvapor concentrations in the extracted soil 'gas stream were measured before entenng the <br /> ' blower(ninfluent stream)and after exiting the Catalytic Oxidizer(effluent stream) using an organic,vapor meter(OVA) equipped with a photo-iomzation detector(PIDThermo Environmental 580A,, <br /> 10 OeV, calibrated to isobutylene) <br /> One soil vapor sample was collected after 24-hours of SVE unit operation and one was collected 5- ; <br /> days of operation Then monthly sampling was conducted In Febru ry and'March <br /> Advanced GcoEnviroamental,Inc. r <br />