Laserfiche WebLink
r - _ <br /> I <br /> y I <br /> - LUSH GEOSCIENCES <br /> FIELD EQUIPMENT PRICE LIST <br /> ITEM UNIT PRICE <br /> Company Vehicles <br /> i <br /> Company Vehicle (Daily Rate) Day $4000 <br /> Company Vehicle (Mileage Rate) M1 S040 <br /> Soil Sampling Eqiupment <br /> Samples Sleeves, Lining, Caps Ea $700 <br /> Photoiomzmg Hydrocarbon Meter (PID) Day $10000 <br /> Groundwater Samplmg Equipment <br /> Bailers, Disposable Ea $1000 <br /> 40 ml VOA Sample Vials Ea $5 00 <br /> 1-1 Amber Glass Sample Bottles Ea S500 <br /> Purge Pump Day $7500 <br /> Grundfos Pinmp Day $11000 <br /> Hydac Meer (T, K,pH) Day $5000 <br /> Water Level Meter(Solinst) Day $2500 <br /> Well Construction,Equipment <br /> PVC 2" SIotted Screen- 0 020" Slots - 10 ft Ea $2850 <br /> PVC 2" Slotted Screen - 0 020" Slots - 5 ft Ea $1850 <br /> PVC 2" Bl-nk Screen - 10 ft Ea S1558 <br /> PVC 2" BIank Screen - 5 ft Ea S1030 <br /> Bottom PIua, Threaded PVC - 2" Ea $660 <br /> SIip Cap, PVC - 2" Ea $1 30 <br /> Locking Wellhead Caps - Brass and Aluminum -2" Ea $24 10 <br /> Locking Wellhead Caps -Plastic - 2" Ea $19 80 <br /> PVC 4" Slotted Screen - 0 020" Slots - 10 ft Ea $6590 <br /> PVC a" Slotted Screen - 0 020" Slots - 5 ft Ea $4000 <br /> PVC 4" Blank Screen - I Oft Ea $4100 <br /> PVC a" Blank Screen- 5 ft Ea $2254 <br /> Bottom Plug, Threaded PVC - 4" Ea $1430 <br /> Slip Cap, PVC - 4" Ea $600 <br /> Locking Wellhead Caps - Plastic Ea $2200 <br /> Wellhead Cover -Traffic Rated - 8" Ea $56 10 <br /> Wellhead Cover -Traffic Rated - 12" Ea S7765 <br /> Wellhead Locks - Keyed Alike Ea $3 30 <br /> Sand-No 3 Monterey - I00-1b Bag Ea $610 <br /> Neat Cement - 90-1b Bag Ea $726 <br /> Bentonite Clips - 50-1b Bag Ea $871 <br /> Bentonite Powder- 50-1b Bag Ea S6 93 <br /> Concrete - 90-1b Bag Ea $3 80 <br /> Surge Block - 2" Day $2500 <br /> Surge Block - 4" Day $3500 <br /> Drams 55-gal Ea S31 50 <br /> Other materials and equipment available on a project-specific quote or cost-plus- !� <br /> i 5°/n basis Matenals purchased for specific projects w111 be invoiced at cost plus 15%1] <br />