My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005175
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0005175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 12:22:05 AM
Creation date
3/17/2020 3:38:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005175
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mw_2 <br /> <0 5 <br /> j L::II + <br /> 1 <br /> �sB M013TE p1A� C AVEISUE <br /> ' SSDSHA53� � <br /> -- VE-5 <br /> * ( ASO-1 ' CID <br /> VW-1 3�- <br /> CHP6 *AS-1 <br /> 1 CB2 <br /> I <br /> 1 I M <br /> Mw-4 W-7 <br /> 56 <br /> BIi/WP6 MON53 �w-3 CBvp � 1 <br /> ' <br /> • � � VE-I �VE-2 VW-7 <br /> B13/WPO � <br /> CBh/CHP4 <br /> ' r <br /> CHP2 <br /> y �EW-2 <br /> B12/WP7 <br /> 1 In <br /> MW-5 <br /> VES UNIT <br /> CHP5C CHP6 <br /> 1 \ <br /> <0 5 j CHP5 <br /> \ SEW-1 <br /> r � / <br /> B7 CHP1 <br /> p <br /> cea <br /> B10/WP5 CHP9 <br /> • <br /> • APPROXIMATE EXTENT <br /> DISSOLVED BENZNE <06 ug/I <br /> � CI{P3 B9/WP4 <br /> ' BB/WP3 <br /> GE D <br /> ' ®BUILDING MAY 1999 BENZENE CONCENTRATION <br /> REPORTED IN MICROGRAMS PER LITER <br /> MW-I �MONITORING WELL LOCATION <br /> AS0-1 *AIR SPARGING OBSERVATION WELL <br />' IAS-1 *AIR SPARGING INJECTION WELL <br /> VW-1 I7 VAPOR EXTRACTION NFL[. T <br /> 50 2 4-VAPOR EXTRACTION k AIR SPARGING OBSERVATION WELL lhav� <br /> B8/wP3 - SOIL BORING <br /> CBI O CONFORMATION SOIL BORING SCALE <br />' CHPI r0 40 80 <br /> CONFORMATION I-IYDRO PUNCH BORING <br /> FEET <br />' ITE PLAN -- BENZENE CONCENTRATIONS � fldvarlced <br /> CHAPIN BROS , INC ®19 GeoEnvironmental, <br />' Noth <br /> Inc. <br /> 1766 MONTE DIABLO AVENUE of nCel,InrJ2M <br /> PROJECT NO AGE—NC-95-0103 FILE CHpp]N FIGURE <br /> DATE 19 TUNE 2000 DRAWN BY MAC <br /> STOCKTON` CALIFORNIA 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.