Laserfiche WebLink
- I <br /> If <br /> {, 5.0 COSTS NOT INCLUDED IN'rTHIS PROPOSAL <br /> r � r <br /> ♦ Permits for off-site drilling, if necessary (not anticipated). <br /> ♦ Installation of additional soil borings and/or monitoring wells. <br /> } ♦ Treatment or disposal of contaminated soil and/or groundwater. <br /> ♦ Additional monitoring, sampling and/or analysis, if required by the regulatory <br /> agencies. <br /> ,y <br /> ♦ Geophysical survey, if needed,'�to locate underground utilities. <br /> ♦ Other costs not specifically stated in this proposal. <br /> �C a <br /> 6.0 THIS PROPOSAL ASSUMES THE FOLLOWING <br /> ♦ Regulatory approval o£ the Work Plan. <br /> ♦ Access to the site will be secured by the Client. <br />{ ♦ All costs incurred due to re ulator} directives, after this proposal, shall be assumed <br /> by the Client. <br /> 0 The cost to remove, repair or relocate underground utilities or hazards that might <br /> interfere with the proposed drilling or excavation or are damaged during the drilling <br /> or excavation, shall be borne by the Client. <br /> ♦ Expense incurred because of un or unanticipated around conditions such as fill <br /> hard soil, rock, etc.) shall be paid for by the Client as extra work. <br /> 7.0 SCHEDULE 9 <br /> i�- <br /> The work outlined in this proposal can be initiated upon receipt of authorization to proceed <br /> from Chapin Bros., Inc. GeoAudit will begin work on the project within five days of receipt <br /> j of authorization to proceed and a dep 8sit of $2,500.00. ' <br /> i <br /> E`E i <br /> Oee6pal AudN 5crvi.w,[ee I1I16 <br /> SP-94-11-51602G1.,:0 SVPJAS Piki Too 5 <br /> k <br /> I F <br /> II <br />