My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005138
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
3310
>
3500 - Local Oversight Program
>
PR0545561
>
ARCHIVED REPORTS_XR0005138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2020 11:31:25 PM
Creation date
3/17/2020 4:20:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005138
RECORD_ID
PR0545561
PE
3528
FACILITY_ID
FA0009490
FACILITY_NAME
KENTS OIL SVC INC
STREET_NUMBER
3310
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14339005
CURRENT_STATUS
02
SITE_LOCATION
3310 E MINER AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE SAFETY AND HEALTH PLAN <br /> This site safety and health plan (SSHP) addresses the potential health and safety hazards and <br /> the procedures to be used during field operations Project descriptions inc.ludmg site information <br /> and project objectives are described previously in the work plan <br /> PROJECT SUMMARY <br /> The project site is Kent Oil Service located at 3310 E Miner Street in Stockton California <br /> The purpose of this investigation is to determine whether the soil and/or groundwater have been <br /> impacted by hydrocarbons The field activities will include drilling and sampling of 14 <br /> boreholes Soil and groundwater will samples will both be collected. The project is expected <br /> to last approximately five days and will involve three on-site personnel one BCC geologist and <br /> . two drillers <br /> KEY PERSONNEL <br /> I <br /> Mr. Pat Cullen is the project manager (PM) Ms Pam Murcell, Certified Industrial <br /> Hygienist (CIH), is the health and safety officer (HSO) Ms. Tina Bauer is the project geologist <br /> and will also function as the site safety officer(SSO) The project field staff have completed 40 <br /> hours of comprehensive health and safety training which meets the requirements of Title 29 Code <br /> of Federal Regulations Part 1910.120(29 CFR 1910 120). The SSO has the authority to monitor <br /> and correct health and safety problems as nouced on site. <br /> The PM is responsible for generating, organizing, and compiling the SSHP which describes <br /> all planned field activities and potential hazards that may be encountered at the site. The PM <br /> is also responsible for assuring that adequate training and safety bnefing(s) for the project are <br /> provided to the project team. The PM has provided a copy of this SSHP to each member of the <br /> project field team and one copy to the subcontractor prior to field activities. <br /> The HSO is responsible for developing and coordinating the Brown and Caldwell (BC) <br /> health and safety program For specific projects, the HSO is responsible for reviewing and <br /> approving the draft SSHP for accuracy and incorporating new information or guidelines which <br /> aid the PM and SSO in further definition and control of the potential health and safety hazards <br /> associated with the project. <br /> 76o3amRTS_WT-0ILSHP <br />
The URL can be used to link to this page
Your browser does not support the video tag.