My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005141
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
3310
>
3500 - Local Oversight Program
>
PR0545561
>
ARCHIVED REPORTS_XR0005141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2020 11:32:57 PM
Creation date
3/17/2020 4:22:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005141
RECORD_ID
PR0545561
PE
3528
FACILITY_ID
FA0009490
FACILITY_NAME
KENTS OIL SVC INC
STREET_NUMBER
3310
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14339005
CURRENT_STATUS
02
SITE_LOCATION
3310 E MINER AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B R 0 W N b',- L, ± E L HEM-,31 <br /> i �( r sal€�;E <br /> CALDWELt�L�� i <br /> . <br /> n Y 17 AN 10' 4 6 <br /> November 16 , 1995 <br /> Mr Bob Fratto <br /> Operations Manager <br /> Sheldon Oil Company <br /> 2850 Cordelia Road, Suite 120 <br /> Fairfield, California 94585 017-1422-0114 <br /> Subject Third Quarter 1995 Groundwater Monitoring Report <br /> Kent's Oil Facility, Stockton,California <br /> Dear Mr Fratto <br /> This report presents results of water-level measurements and groundwater sampling performed <br /> during the third quarter of 1995 at Kent's Oil Facility located at 3310 E Miner Street, Stockton, <br /> California The work was performed on August 31, 1995, by Brown and Caldwell <br /> There are three on-site wells MWA, MW-2, and MW-3 Well locations are shown on <br /> Figure 1 Water-Ievel measurements and groundwater samples were collected from all three <br /> wells during the third quarter sampling event <br /> Field and Analytical Methods <br /> Prior to commencing purging, static water levels and total depth were measured and a check for <br /> floating product was made in each well Prior to sampling,the wells were purged of a minimum <br /> of three well casing volumes using a submersible pump After purging, each well was sampled <br /> using a disposable bailer <br /> All groundwater samples were analyzed for benzene, toluene, ethylbenzene, and xylene isomers <br /> (BTEX) by U S Environmental Protection Agency (EPA) Method 602, total petroleum <br /> hydrocarbons as gasoline (TPH-G) by EPA Method 8015 Modified/Purge and Trap, diesel <br /> (TPH-D),and motor oil (WH-MO), by EPA Method 5030/8015 Modified <br /> Results <br /> The groundwater flow direction on August 31, 1995 was to the south under a hydraulic gradient <br /> of 0 035 and is shown on Figure I The hydraulic gradient increased during the second quarter <br /> of 1995 and remains moderately steep The change in the gradient value is probably due to the <br /> This report was prepared in accordance with the standards of the environmental consulting industry at the time a was <br /> prepared It should not be relied upon by parties other than those for whom it was prepared and then only to the <br /> extent of the scope of work which was authorized This report does not guarantee that no additional environmental <br /> contamination beyond that described in this report exists at the site <br /> Environmental Engineering And Consulting Aralybcal5ery ces 142MEPORTS\95QTR RPMRD95QTR DOC <br /> 9616 \11{Rp1, AIENLE $LITE 600 SACROIENTO CA 9)827 2627 <br /> 1916) 444 012.) Fat (9t6) 8)6 )277 <br />
The URL can be used to link to this page
Your browser does not support the video tag.